Gur Mosheiov

From MaRDI portal
Person:190064

Available identifiers

zbMath Open mosheiov.gurWikidataQ29913224 ScholiaQ29913224MaRDI QIDQ190064

List of research outcomes

PublicationDate of PublicationType
Single machine scheduling to minimize maximum earliness/tardiness cost with job rejection2024-03-27Paper
A note on batch scheduling on a two-machine flowshop with machine-dependent processing times2023-10-24Paper
On the minmax common-due-date problem: extensions to position-dependent processing times, job rejection, learning effect, uniform machines and flowshops2023-10-10Paper
A note: maximizing the weighted number of just-in-time jobs for a given job sequence2023-08-28Paper
The LPT heuristic for minimizing total load on a proportionate openshop2023-08-02Paper
A note on lot scheduling on a single machine to minimize maximum weighted tardiness2023-08-02Paper
Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity2023-07-04Paper
Scheduling to maximize the weighted number of on-time jobs on parallel machines with bounded job-rejection2023-06-27Paper
New Results On Sequencing With Rate Modification2023-05-05Paper
A Due-Window Determination In Minmax Scheduling Problems2023-04-24Paper
Multi-Machine Scheduling With Linear Deterioration2023-04-21Paper
On the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-dates2022-11-04Paper
A greedy heuristic for solving scheduling problems with bounded rejection cost2022-06-22Paper
Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work2022-06-10Paper
Scheduling with competing agents, total late work and job rejection2022-03-07Paper
Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates2022-01-14Paper
Minmax due-date assignment on a two-machine flowshop2021-11-09Paper
A note on the single machine CON and CONW problems with lot scheduling2021-09-28Paper
Minimizing total late work on a single machine with generalized due-dates2021-06-07Paper
Minmax scheduling and due-window assignment with position-dependent processing times and job rejection2021-05-20Paper
Single machine lot scheduling with optional job-rejection2021-05-11Paper
Scheduling problems with a weight-modifying-activity2021-05-05Paper
Coupled task scheduling with convex resource consumption functions2021-03-25Paper
Flowshop scheduling with learning effect and job rejection2020-12-11Paper
Lot scheduling on a single machine to minimize the (weighted) number of tardy orders2020-10-07Paper
Minimizing total load on parallel machines with linear deterioration2020-04-27Paper
Comments on ``Proportionate flowshops with general position dependent processing times and ``Minimizing total load on a proportionate flowshop with position-dependent processing times and job-rejection2019-05-10Paper
Single machine just‐in‐time scheduling problems with two competing agents2019-05-02Paper
Determining optimal sizes of bounded batches with rejection via quadratic min-cost flow2019-05-02Paper
A note: minimizing total absolute deviation of job completion times on unrelated machines with general position-dependent processing times and job-rejection2019-03-06Paper
Batch scheduling with step-deteriorating processing times to minimize flowtime2019-03-05Paper
Two-machine flow shop and open shop scheduling problems with a single maintenance window2018-07-25Paper
Minmax scheduling with acceptable lead-times: extensions to position-dependent processing times, due-window and job rejection2018-07-11Paper
Minimizing total load on a proportionate flowshop with position-dependent processing times and job-rejection2018-03-16Paper
Scheduling with two competing agents to minimize total weighted earliness2017-08-22Paper
A two-agent single machine scheduling problem with due-window assignment and a common flow-allowance2017-08-03Paper
A two-stage flow shop scheduling with a critical machine and batch availability2017-04-25Paper
Scheduling with job-rejection and position-dependent processing times on proportionate flowshops2017-04-20Paper
A single machine scheduling problem to minimize total early work2016-11-17Paper
Scheduling problems with two competing agents to minimized weighted earliness-tardiness2016-11-11Paper
A note: minmax due-date assignment problem with lead-time cost2016-11-10Paper
Batch scheduling of identical jobs with controllable processing times2016-11-10Paper
Scheduling a deteriorating maintenance activity and due-window assignment2016-11-10Paper
Minsum and minmax scheduling on a proportionate flowshop with common flow-allowance2016-10-07Paper
Due-window assignment problems with unit-time jobs2016-01-18Paper
Batch scheduling in a two-stage flexible flow shop problem2016-01-04Paper
Due-window assignment with identical jobs on parallel uniform machines2015-07-28Paper
A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop2014-12-09Paper
A note: minimizing maximum earliness on a proportionate flowshop2014-12-09Paper
Maximizing the weighted number of just-in-time jobs on a single machine with position-dependent processing times2014-08-18Paper
The optimal number of used machines in a two-stage flexible flowshop scheduling problem2014-08-18Paper
Minmax due-date assignment with a time window for acceptable lead-times2014-05-08Paper
An improved algorithm for due-window assignment on parallel identical machines with unit-time jobs2014-04-14Paper
Proportionate flowshops with general position-dependent processing times2013-04-04Paper
Scheduling job classes on uniform machines2012-11-15Paper
Batch scheduling on uniform machines to minimize total flow-time2012-11-15Paper
Minimizing the number of tardy jobs on a proportionate flowshop with general position-dependent processing times2012-11-15Paper
Scheduling on parallel identical machines with job-rejection and position-dependent processing times2012-10-23Paper
Batch scheduling of identical jobs on parallel identical machines2012-10-23Paper
Batch scheduling on a two-machine jobshop with machine-dependent setup times2012-06-18Paper
Single machine batch scheduling with two competing agents to minimize total flowtime2012-05-23Paper
https://portal.mardi4nfdi.de/entity/Q30711462011-02-01Paper
https://portal.mardi4nfdi.de/entity/Q30709282011-01-28Paper
Total absolute deviation of job completion times on uniform and unrelated machines2010-12-01Paper
Batch scheduling on two-machine flowshop with machine-dependent setup times2010-11-16Paper
Scheduling a deteriorating maintenance activity on a single machine2010-09-02Paper
The Browne-Yechiali single-machine sequence is optimal for flow-shops2010-06-11Paper
Scheduling problems with two competing agents to minimize minmax and minsum earliness measures2010-06-11Paper
Scheduling with a common due-window: polynomially solvable cases2010-03-11Paper
Single machine scheduling with batch-dependent setup times2010-01-18Paper
Scheduling identical jobs and due-window on uniform machines2009-11-17Paper
Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine2009-11-16Paper
Scheduling a maintenance activity to minimize total weighted completion-time2009-07-13Paper
A note: Simple heuristics for scheduling a maintenance activity on unrelated machines2009-05-19Paper
Scheduling a maintenance activity on parallel identical machines2009-04-22Paper
Scheduling a maintenance activity and due-window assignment on a single machine2009-04-03Paper
A multi-criteria scheduling with due-window assignment problem2009-03-23Paper
Minimizing total absolute deviation of job completion times: extensions to position-dependent processing times and parallel identical machines2009-03-03Paper
Minmax scheduling problems with a common due-window2009-02-12Paper
Due-date assignment on uniform machines2009-01-22Paper
A due-window assignment problem with position-dependent processing times2008-08-14Paper
An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs2008-04-28Paper
Due-date assignment and maintenance activity scheduling problem2008-04-17Paper
A single machine batch scheduling problem with bounded batch size2008-01-21Paper
Open-shop batch scheduling with identical jobs2008-01-21Paper
A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time2007-10-10Paper
Minmax scheduling with job-classes and earliness-tardiness costs2006-12-07Paper
Minimizing weighted earliness-tardiness and due-date cost with unit processing-time jobs2006-04-28Paper
A note on scheduling deteriorating jobs2006-02-06Paper
Minimizing flow-time on a single machine with integer batch sizes2005-08-25Paper
Scheduling unit processing time jobs on an m-machine flow-shop2005-05-23Paper
Minimizing total completion time and total deviation of job completion times from a restrictive due-date2005-05-12Paper
Note on scheduling with general learning curves to minimize the number of tardy jobs2005-04-26Paper
Due-date assignment with asymmetric earliness–tardiness cost2005-04-04Paper
Parallel machine scheduling with a learning effect2005-03-16Paper
A note on a due-date assignment on a two-machine flow-shop2005-02-23Paper
Due-window assignment with unit processing-time jobs2005-02-22Paper
Flow-shop batch scheduling with identical processing-time jobs2005-01-11Paper
A note on flow-shop and job-shop batch scheduling with identical processing-time jobs2004-11-22Paper
Comments on Flow shop and open shop scheduling with a critical machine and two operations per job2004-08-16Paper
Simultaneous minimization of total completion time and total deviation of job completion times2004-08-16Paper
A note on the SPT heuristic for solving scheduling problems with generalized due dates2004-06-15Paper
A note on the maximum number of on-time jobs on parallel identical machines.2004-02-14Paper
Scheduling with general job-dependent learning curves.2003-05-19Paper
The solution of the soccer ``Dream League game2002-09-24Paper
Complexity analysis of job-shop scheduling with deteriorating jobs2002-05-15Paper
Scheduling problems with a learning effect2001-07-29Paper
Minmax earliness-tardiness costs with unit processing time jobs2001-07-12Paper
Minimizing maximum earliness on parallel identical machines2001-05-13Paper
https://portal.mardi4nfdi.de/entity/Q45269232001-01-31Paper
A common due-data assignment problem on parallel identical machines2001-01-01Paper
Asymptotic optimality in probability of a heuristic schedule for open shops with job overlaps1998-11-15Paper
Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs1998-01-25Paper
Single Machine Scheduling Problems with General Breakdowns, Earliness and Tardiness Costs1997-11-25Paper
Heuristics for multimachine minmax scheduling problems with general earliness and tardiness costs1997-11-25Paper
On trend estimation of time-series: a simple linear programming approach1997-07-23Paper
Λ-Shaped Policies to Schedule Deteriorating Jobs1997-03-31Paper
The pickup delivery location problem on networks1997-02-03Paper
Single machine scheduling to minimize the number of early and tardy jobs1996-07-24Paper
Greedy heuristics for single-machine scheduling problems with general earliness and tardiness costs1995-07-06Paper
Scheduling jobs under simple linear deterioration1995-04-17Paper
Minimizing the sum of job completion times on capacitated parallel machines1995-04-02Paper
The travelling salesman problem with pick-up and delivery1995-01-11Paper
The traveling salesman problem with delivery and backhauls1995-01-11Paper
https://portal.mardi4nfdi.de/entity/Q42879851994-04-19Paper
V-Shaped Policies for Scheduling Deteriorating Jobs1992-09-26Paper
Smoothing time-series data by nonmetric polytone curves1988-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Gur Mosheiov