Philippe Baptiste

From MaRDI portal
Person:207391

Available identifiers

zbMath Open baptiste.philippeWikidataQ106287381 ScholiaQ106287381MaRDI QIDQ207391

List of research outcomes





PublicationDate of PublicationType
Redundant cumulative constraints to compute preemptive bounds2017-12-20Paper
Graphs with maximal induced matchings of the same size2016-11-24Paper
Polynomial-time algorithms for minimum energy scheduling2014-09-09Paper
Integer preemptive scheduling on parallel machines2013-03-05Paper
The \(K\) king problem, an abstract model for computing aircraft landing trajectories: on modeling a dynamic hybrid system with constraints2012-07-28Paper
https://portal.mardi4nfdi.de/entity/Q31157182012-02-10Paper
Properties of optimal schedules in preemptive shop scheduling2011-03-10Paper
Scheduling unit tasks to minimize the number of idle periods2010-08-16Paper
Sequencing a single machine with due dates and deadlines: An ILP-based approach to solve very large instances2010-05-07Paper
A note on scheduling identical coupled tasks in logarithmic time2010-05-05Paper
On maximizing the profit of a satellite launcher: selecting and scheduling tasks with time windows and setups2010-04-28Paper
Fast paths in large-scale dynamic road networks2010-03-15Paper
On scheduling a single machine to minimize a piecewise linear objective function: A compact MIP formulation2010-03-09Paper
Time-indexed formulations for scheduling chains on a single machine: an application to airborne radars2009-12-21Paper
Integrality Property in Preemptive Parallel Machine Scheduling2009-08-18Paper
Fast Computation of Point-to-Point Paths on Time-Dependent Road Networks2009-01-27Paper
Lower bounds for parallel machine scheduling problems2008-10-02Paper
Polynomial Time Algorithms for Minimum Energy Scheduling2008-09-25Paper
Inter-distance Constraint: An Extension of the All-Different Constraint for Scheduling Equal Length Jobs2008-09-09Paper
Runway sequencing with holding patterns2008-04-24Paper
Lagrangian bounds for just-in-time job-shop scheduling2007-10-19Paper
Dominance-based heuristics for one-machine total cost scheduling problems2007-10-10Paper
On scheduling a multifunction radar2007-06-08Paper
The complexity of mean flow time scheduling problems with release times2007-05-15Paper
Arc-B-consistency of the inter-distance constraint2007-05-10Paper
https://portal.mardi4nfdi.de/entity/Q34264332007-03-09Paper
Airspace sectorization with constraints2006-07-11Paper
Scheduling with a constraint based cooperative solver2006-03-09Paper
https://portal.mardi4nfdi.de/entity/Q54636082005-08-05Paper
Scheduling a single machine to minimize a regular objective function under setup constraints2005-06-01Paper
Shortest path to nonpreemptive schedules of unit-time jobs on two identical parallel machines with minimum total completion time2005-02-08Paper
Ten notes on equal-processing-time scheduling: at the frontiers of solvability in polynomial time2004-10-28Paper
Tight LP bounds for resource constrained project scheduling2004-09-22Paper
A branch-and-bound procedure to minimize total tardiness on one machine with arbitrary release dates2004-08-10Paper
Preemptive scheduling of equal-length jobs to maximize weighted throughput.2004-03-15Paper
A note on scheduling multiprocessor tasks with identical processing times.2003-11-17Paper
A note on scheduling tall/small multiprocessor tasks with unit processing time to minimize maximum tardiness2003-08-21Paper
Batching identical jobs2003-08-18Paper
On minimizing the weighted number of late jobs in unit execution time open-shops.2003-07-30Paper
Constraint-based scheduling: Applying constraint programming to scheduling problems.2003-07-28Paper
A branch and bound to minimize the number of late jobs on a single machine with release time constraints2003-04-28Paper
On preemption redundancy in scheduling unit processing time jobs on two parallel machines2002-09-22Paper
On minimizing total tardiness in a serial batching problem2002-08-25Paper
Polynomial time algorithms for minimizing the weighted number of late jobs on a single machine with equal processing times2001-11-06Paper
An O\((n^4)\) algorithm for preemptive scheduling of a single machine to minimize the number of late jobs2001-03-04Paper
Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems2000-08-13Paper
Scheduling equal-length jobs on identical parallel machines2000-07-11Paper
Satisfiability tests and time-bound adjustments for cumulative scheduling problems2000-01-11Paper
Resource constraints for preemptive job-shop scheduling1999-02-02Paper
Heuristic control of a constraint-based algorithm for the preemptive job-shop scheduling problem1999-01-01Paper

Research outcomes over time