Shashibhushan B. Mahadik

From MaRDI portal
Person:2088579



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
The EWMA Wilcoxon signed-rank chart with variable sampling interval
Stochastics and Quality Control
2026-01-30Paper
Distribution-free Phase II Shewhart control chart for joint monitoring of location and scale based on max-type statistic
Journal of Statistical Computation and Simulation
2026-01-01Paper
A two-sided SPRT control chart for process mean
Journal of Statistical Computation and Simulation
2025-06-26Paper
The combined Shewhart-CUSUM sign charts
Communications in Statistics. Simulation and Computation
2024-05-28Paper
The SPRT sign chart for process location
Communications in Statistics: Theory and Methods
2023-06-27Paper
The SPRT sign chart for process dispersion
Stochastics and Quality Control
2022-10-06Paper
A two-sided SPRT control chart for process dispersion
Journal of Statistical Computation and Simulation
2022-03-24Paper
A unified approach to adaptive Shewhart control charts
Communications in Statistics: Theory and Methods
2017-12-15Paper
\(\overline{X}\) charts with variable control and warning limits
Economic Quality Control
2014-03-17Paper
Exact results for variable sampling interval Shewhart control charts with runs rules for switching between sampling interval lengths
Communications in Statistics: Theory and Methods
2013-01-31Paper
A Special Variable Sample Size and Sampling Interval Chart
Communications in Statistics: Theory and Methods
2009-07-16Paper
On the Superiority of a Variable Sampling Interval Control Chart
Journal of Applied Statistics
2009-02-24Paper
Economic Design of A Modified Variable Sample Size and Sampling Interval Chart
Economic Quality Control
2008-09-25Paper


Research outcomes over time


This page was built for person: Shashibhushan B. Mahadik