Longmin He

From MaRDI portal
Person:2370334



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
The control and modified projective synchronization of a class of 2, 3, 4-dimensional (chaotic) systems with parameter and model uncertainties and external disturbances via adaptive control
Chinese Journal of Physics (Taipei)
2024-05-08Paper
Minimizing makespan in a three-stage flexible flowshop with identical machines and two batch processors2018-07-18Paper
scientific article; zbMATH DE number 6263663 (Why is no real title available?)2014-02-28Paper
Two-stage flowshop scheduling problems with identical and batch processors
Asia-Pacific Journal of Operational Research
2011-01-19Paper
scientific article; zbMATH DE number 5732579 (Why is no real title available?)2010-07-08Paper
Two-stage flexible flowshop scheduling problems with a batch processor on second stage2009-07-22Paper
A dynamic programming algorithm for scheduling problems on earliness award and tardiness penalty with time-dependent processing time
Journal of Shanghai University (English Edition)
2009-07-22Paper
Parallel machine scheduling problems with proportionally deteriorating jobs
International Journal of Systems Science. Principles and Applications of Systems and Integration
2009-03-10Paper
A hybrid two-stage flexible flowshop scheduling problem with m identical parallel machines and a burn-in processor separately
Journal of Shanghai University (English Edition)
2008-01-14Paper
Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
European Journal of Operational Research
2007-06-25Paper
A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM
Asia-Pacific Journal of Operational Research
2007-03-21Paper


Research outcomes over time


This page was built for person: Longmin He