Lars Mönch

From MaRDI portal
Person:256690

Available identifiers

zbMath Open monch.larsMaRDI QIDQ256690

List of research outcomes





PublicationDate of PublicationType
Metaheuristics for solving a flexible flow-shop scheduling problem with s-batching machines2024-09-24Paper
A rolling horizon planning approach for short-term demand supply matching2024-09-20Paper
Unrelated parallel machine scheduling with eligibility constraints and delivery times to minimize total weighted tardiness2022-12-19Paper
A survey of scheduling with parallel batch (p-batch) processing2022-02-22Paper
Parallel machine scheduling with the total weighted delivery time performance measure in distributed manufacturing2021-05-21Paper
Hybrid algorithms for the earliness–tardiness single-machine multiple orders per job scheduling problem with a common due date2019-05-07Paper
Decomposition methods for cost and tardiness reduction in aircraft manufacturing flow lines2018-12-17Paper
Heuristics for vehicle routing problems with backhauls, time windows, and 3D loading constraints2018-05-30Paper
A clearing function based bid-price approach to integrated order acceptance and release decisions2018-05-30Paper
A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines2018-04-13Paper
Multiobjective scheduling of jobs with incompatible families on parallel batch machines2018-04-12Paper
Scheduling jobs on a single batch processing machine with incompatible job families and weighted number of tardy jobs objective2017-01-05Paper
Heuristic approaches for scheduling jobs in large-scale flexible job shops2016-11-17Paper
Grouping genetic algorithms for solving single machine multiple orders per job scheduling problems2016-03-09Paper
A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups2015-01-22Paper
An iterative approach for the serial batching problem with parallel machines and job families2013-09-03Paper
Heuristic approaches for master planning in semiconductor manufacturing2012-11-15Paper
Integrated heuristics for scheduling multiple order jobs in a complex job shop2011-05-23Paper
https://portal.mardi4nfdi.de/entity/Q53017372009-01-20Paper
Decomposition heuristics for minimizing earliness-tardiness on parallel burn-in ovens with a common due date2007-06-04Paper
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops2006-12-14Paper
Minimizing earliness-tardiness on a single burn-in oven with a common due date and maximum allowable tardiness constraint2006-11-03Paper
https://portal.mardi4nfdi.de/entity/Q54794582006-07-10Paper
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times2005-06-27Paper
Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness2005-04-18Paper
https://portal.mardi4nfdi.de/entity/Q47899062003-01-27Paper
On the numerical solution of a hypersingular integral equation for elastic scattering from a planar crack2000-12-19Paper
On the inverse acoustic scattering problem by an open arc: the sound-hard case1997-11-12Paper
https://portal.mardi4nfdi.de/entity/Q43467591997-08-05Paper
On the numerical solution of the direct scattering problem for an open sound-hard arc1997-01-22Paper
A Newton method for solving the inverse scattering problem for a sound-hard obstacle1996-06-23Paper

Research outcomes over time

This page was built for person: Lars Mönch