S. K. Goyal

From MaRDI portal
Person:275070

Available identifiers

zbMath Open goyal.suresh-kumarMaRDI QIDQ275070

List of research outcomes





PublicationDate of PublicationType
Vendor managed inventory models under contractual agreement2018-05-29Paper
Vendor-managed inventory models for items with imperfect quality2017-05-31Paper
Coping with uncertainties in production planning through fuzzy mathematical programming: application to steel rolling industry2017-05-31Paper
Replenishment decisions under two-level credit policy for flexible credit linked demand2017-05-31Paper
Synchronisation of order cycles of multiple buyers in a supply chain with trade credit policy2017-05-31Paper
A vendor managed inventory model under contractual storage agreement2016-11-10Paper
Optimal credit period and lot size for deteriorating items with expiration dates under two-level trade credit financing2016-06-23Paper
An integrated inventory model with variable lead time, defective units and delay in payments2016-04-25Paper
\((Q,r,L)\) model for stochastic demand with lead-time dependent partial backlogging2015-11-09Paper
Economical production and transshipment policy for coordinating multiple production sites2015-02-04Paper
Estimating production test properties from test measurement data2014-05-06Paper
Optimal order size to take advantage of a one-time discount offer with allowed backorders2010-08-26Paper
Comment on ‘Optimal inventory replenishment policy for the EPQ model under trade credit derived without derivatives’2009-11-16Paper
A comprehensive note on: an inventory model under two levels of trade credit and limited storage space derived without derivatives2009-10-16Paper
An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity2009-02-23Paper
Retailer's lot-sizing policy under partially funded permissible delay in payments2009-02-12Paper
Optimal ordering and transfer policy for an inventory with stock dependent demand2009-01-08Paper
INVENTORY LOT-SIZE MODELS UNDER TRADE CREDITS: A REVIEW2008-08-26Paper
ECONOMIC ORDER QUANTITY UNDER CONDITIONS OF A ONE-TIME-ONLY EXTENDED PERMISSIBLE DELAY PERIOD IN PAYMENTS2008-08-26Paper
https://portal.mardi4nfdi.de/entity/Q35210042008-08-26Paper
Retailer's optimal replenishment decisions with credit-linked demand under permissible delay in payments2008-04-24Paper
On continuous review stock control with multiple suppliers and non-negative lead times with special emphasis on Erlang distribution.2008-03-13Paper
A review of the joint replenishment problem literature: 1989--20052007-11-23Paper
On a volume flexible inventory model for items with an imperfect production system2007-06-14Paper
An inventory model with Weibull demand rate, finite rate of production and shortages2007-05-09Paper
Optimal ordering policies when the supplier provides a progressive interest scheme2007-01-09Paper
On ``An EOQ model for perishable items under stock-dependent selling rate and time-dependent partial backlogging by Dye and Ouyang2006-09-13Paper
https://portal.mardi4nfdi.de/entity/Q46728112005-05-03Paper
A production--inventory model for a deteriorating item with trended demand and shortages2004-08-16Paper
Recent trends in modeling of deteriorating inventory2001-10-10Paper
Determination of economic production-shipment policy for a single-vendor--single-buyer system2000-03-19Paper
The Trended Inventory Lot Sizing Problem with Shortages Under a New Replenishment Policy1997-01-15Paper
An Alternative Procedure for Determining the Optimal Policy for an Inventory Item Having Linear Trend in Demand1995-08-08Paper
Joint replenishment inventory control: Deterministic and stochastic models1989-01-01Paper
Optimal ordering decisions for two substitutable products with stochastic demands1984-01-01Paper
Economic operating policy and variations in production load1983-01-01Paper
A unified EPQ model for packaging two items jointly manufactured through several stages1981-01-01Paper

Research outcomes over time

This page was built for person: S. K. Goyal