Bahman Naderi

From MaRDI portal
Person:280179

Available identifiers

zbMath Open naderi.bahmanMaRDI QIDQ280179

List of research outcomes





PublicationDate of PublicationType
Mixed-Integer Programming vs. Constraint Programming for Shop Scheduling Problems: New Results and Outlook2024-03-22Paper
A multiobjective model for optimizing green closed-loop supply chain network under uncertain environment by NSGA-II metaheuristic algorithm2022-09-27Paper
Solving the Type-2 Assembly Line Balancing with Setups Using Logic-Based Benders Decomposition2022-06-28Paper
Type-2 integrated process-planning and scheduling problem: reformulation and solution algorithms2022-06-22Paper
Supply Chain Network Design Under Uncertainty: A Case Study Research in Fast Moving Consumer Goods2022-02-28Paper
Maximal covering salesman problems with average travelling cost constraints2021-11-17Paper
Solving integrated operating room planning and scheduling: logic-based Benders decomposition versus branch-price-and-cut2021-06-07Paper
A Benders decomposition approach for a real case supply chain network design with capacity acquisition and transporter planning: wheat distribution network2020-08-28Paper
Branch-relax-and-check: a tractable decomposition method for order acceptance and identical parallel machine scheduling2020-06-17Paper
A robust possibilistic programming model for a responsive closed loop supply chain network design2019-09-10Paper
An inventory model with imperfect item, inspection errors, preventive maintenance and partial backlogging in uncertainty environment2019-07-23Paper
A robust possibilistic programming model for water allocation problem2019-06-07Paper
Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems2019-02-14Paper
Truck routing and scheduling for cross-docking in the supply chain: model and solution method2018-02-23Paper
Hybrid Genetic Algorithm and Invasive Weed Optimization via Priority Based Encoding for Location-Allocation Decisions in a Three-Stage Supply Chain2017-08-10Paper
A study on open shop scheduling to minimise total tardiness2017-03-01Paper
The type E simple assembly line balancing problem: a mixed integer linear programming formulation2016-11-17Paper
Optimal decisions in a dual-channel supply chain under simultaneous demand and production cost disruptions2016-11-07Paper
A scatter search algorithm for the distributed permutation flowshop scheduling problem2016-06-24Paper
Pricing decisions for complementary products with firm's different market powers in fuzzy environments2016-06-17Paper
New formulations for the setup assembly line balancing and scheduling problem2016-05-04Paper
Polynomial time approximation algorithms for proportionate open‐shop scheduling2015-04-22Paper
Scheduling open shops with parallel machines to minimize total completion time2010-11-30Paper
Scheduling job shop problems with sequence-dependent setup times2010-11-07Paper
The distributed permutation flowshop scheduling problem2009-11-27Paper
A contribution and new heuristics for open shop scheduling2009-10-16Paper
Algorithms for a realistic variant of flowshop scheduling2009-10-15Paper

Research outcomes over time

This page was built for person: Bahman Naderi