Chung-Lun Li

From MaRDI portal
Person:280933

Available identifiers

zbMath Open li.chung-lunWikidataQ102304230 ScholiaQ102304230MaRDI QIDQ280933

List of research outcomes





PublicationDate of PublicationType
Work Package Sizing and Project Performance2020-10-12Paper
Dynamic lot sizing with all‐units discount and resales2019-03-05Paper
Polynomial-Time Solvability of Dynamic Lot Size Problems2016-08-12Paper
Multitasking via alternate and shared processing: algorithms and complexity2016-05-18Paper
Faster algorithms for single machine scheduling with release dates and rejection2016-05-10Paper
Fully Polynomial Time Approximation Schemes for Stochastic Dynamic Programs2015-04-17Paper
Improved algorithms for single-machine common due window assignment and scheduling with batch deliveries2015-01-30Paper
Multiple subset sum with inclusive assignment set restrictions2013-06-27Paper
Berth allocation with time-dependent physical limitations on vessels2012-05-14Paper
Flexible and Risk-Sharing Supply Contracts Under Price Uncertainty2012-02-12Paper
Approximation results for min-max path cover problems in vehicle routing2011-01-06Paper
https://portal.mardi4nfdi.de/entity/Q35794522010-08-06Paper
Scheduling parallel machines with inclusive processing set restrictions and job release times2009-12-10Paper
Fully polynomial-time approximation schemes for time-cost tradeoff problems in series-parallel project networks2009-08-14Paper
Dynamic Lot Sizing with Batch Ordering and Truckload Discounts2009-07-14Paper
A new solution method for the finite-horizon discrete-time EOQ problem2009-04-08Paper
A note on unrelated parallel machine scheduling with time-dependent processing times2009-03-03Paper
Fully Polynomial Time Approximation Schemes for Time-Cost Tradeoff Problems in Series-Parallel Project Networks2008-11-27Paper
Scheduling parallel machines with inclusive processing set restrictions2008-08-11Paper
An asymptotic approximation scheme for the concave cost bin packing problem2008-07-21Paper
Quantifying supply chain ineffectiveness under uncoordinated pricing decisions2008-05-29Paper
An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs2008-04-28Paper
The impact of manufacturer rebates on supply chain profits2008-01-23Paper
Bin‐packing problem with concave costs of bin utilization2008-01-23Paper
Machine scheduling with pickup and delivery2008-01-23Paper
Scheduling unit-length jobs with machine eligibility restrictions2006-09-13Paper
Improved algorithm for maximizing service of carousel storage2005-09-02Paper
Machine scheduling with deliveries to multiple customer locations2005-02-09Paper
Lot streaming with supplier-manufacturer coordination2005-01-11Paper
Interblock Crane Deployment in Container Terminals2003-07-07Paper
A multiprocessor task scheduling model for berth allocation: Heuristic and worst-case analysis2003-04-02Paper
Single machine scheduling to minimize total compression plus weighted flow cost is NP-hard.2002-07-14Paper
Analysis of a new vehicle scheduling and location problem2002-03-14Paper
Minimizing total completion time in two-processor task systems with prespecified processor allocations1999-06-27Paper
Scheduling with agreeable release times and due dates on a batch processing machine1999-04-27Paper
Scheduling to minimize the total compression and late costs1998-03-25Paper
Single-machine scheduling with trade-off between number of tardy jobs and resource allocation1997-08-07Paper
On the fixed interval due-date scheduling problem1996-10-03Paper
Scheduling to minimize release-time resource consumption and tardiness penalties1996-09-15Paper
A heuristic for parallel machine scheduling with agreeable due dates to minimize the number of late jobs1995-05-30Paper
The parallel machine min-max weighted absolute lateness scheduling problem1995-03-15Paper
Single-machine scheduling to minimize the weighted number of early and tardy agreeable jobs1995-01-11Paper
Scheduling to minimize the total weighted completion time with a constraint on the release time resource consumption1995-01-11Paper
Scheduling with resource-dependent release dates—a comparison of two different resource consumption functions1994-12-01Paper
Probabilistic Analysis of a Vehicle Routing Problem with Time Windows1994-10-12Paper
A note on one-processor scheduling with asymmetric earliness and tardiness penalties1993-08-16Paper
On the Distance Constrained Vehicle Routing Problem1993-01-17Paper
Finding disjoint paths with different path-costs: Complexity and algorithms1993-01-17Paper
Analysis of heuristics for the design of tree networks1993-01-16Paper
Worst-Case Analysis of Heuristics for Multidepot Capacitated Vehicle Routing Problems1993-01-16Paper
Dynamic programming approach to the \(n/m/\)parallel\(/\sum_{i=1}^{m} \{\sum {w_ j} \sum {t_ j} \}\) scheduling problem1993-01-05Paper
On the minimum-cardinality-bounded-diameter and the bounded-cardinality- minimum-diameter edge addition problems1992-12-17Paper
The point-to-point delivery and connection problems: Complexity and algorithms1992-09-27Paper
Equipartitions of graphs1992-06-28Paper
The complexity of finding two disjoint paths with min-max objective function1990-01-01Paper

Research outcomes over time

This page was built for person: Chung-Lun Li