Notice: Unexpected clearActionName after getActionName already called in /var/www/html/includes/context/RequestContext.php on line 338
Shrikant S. Panwalkar - MaRDI portal

Shrikant S. Panwalkar

From MaRDI portal
(Redirected from Person:296783)
Person:1268194

Available identifiers

zbMath Open panwalkar.shrikant-sMaRDI QIDQ1268194

List of research outcomes

PublicationDate of PublicationType
Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines2020-03-10Paper
The evolution of schematic representations of flow shop scheduling problems2020-03-06Paper
Analysis of flow shop scheduling anomalies2019-09-09Paper
Scheduling research and the first decade of NRLQ: A historical perspective2019-05-02Paper
On equivalence between the proportionate flow shop and single‐machine scheduling problems2019-05-02Paper
A note on combined job selection and sequencing problems2019-03-26Paper
Review of the ordered and proportionate flow shop scheduling research2019-03-05Paper
The proportionate two-machine no-wait job shop scheduling problem2016-10-07Paper
The two-machine no-wait general and proportionate open shop makespan problem2016-06-23Paper
A note on the complexity of scheduling problems with linear job deterioration2015-06-22Paper
Proportionate flow shop: New complexity results and models with due date assignment2015-05-06Paper
An \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines2012-12-29Paper
Common due window size and location determination in a single machine scheduling problem2005-01-19Paper
Determination of common due window location in a single machine scheduling problem1998-10-18Paper
A single machine scheduling problem with common due window and controllable processing times1997-12-04Paper
A heuristic for the single machine tardiness problem1994-02-28Paper
Single Stage Minimum Absolute Lateness Problem with a Common Due Date on Non-Identical Machines1993-08-23Paper
The Lessons of Flowshop Scheduling Research1992-06-28Paper
Scheduling of a Two-machine Flowshop with Travel Time Between Machines1991-01-01Paper
Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem1982-01-01Paper
Analysis of the left tail for the makespan distribution in flow-shop problems1981-01-01Paper
Counterexamples to optimal permutation schedules for certain flow shop problems1981-01-01Paper
Ordered Flow Shop Problems with no In-Process Waiting: Further Results1980-01-01Paper
An Ordered Flow Shop Sequeneing Problem With TWK Type Due Dates and Total Tardiness Criterion1979-01-01Paper
Flow Shop Scheduling Problems with No In-Process Waiting: A Special Case1979-01-01Paper
A Survey of Scheduling Rules1977-01-01Paper
A convex property of an ordered flow shop sequencing problem1977-01-01Paper
Flowshop sequencing problem with ordered processing time matrices: A general case1976-01-01Paper
Flowshop Sequencing Problem with Ordered Processing Time Matrices1975-01-01Paper
An improved branch and bound procedure forn ×m flow shop problems1975-01-01Paper
https://portal.mardi4nfdi.de/entity/Q32129091973-01-01Paper
Job Shop Sequencing Problem on Two Machines with Time Lag Constraints1973-01-01Paper
Parametric analysis of linear programs with upper bounded variables1973-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Shrikant S. Panwalkar