Harun Aydilek

From MaRDI portal
(Redirected from Person:296866)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times
Engineering Optimization
2023-10-10Paper
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure
Journal of Industrial and Management Optimization
2021-09-10Paper
Insider trading with different risk attitudes
Journal of Economics
2021-01-06Paper
Two-stage assembly scheduling problem for minimizing total tardiness with setup times
Applied Mathematical Modelling
2020-02-05Paper
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times
Applied Mathematical Modelling
2020-01-27Paper
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
Applied Mathematics and Computation
2020-01-14Paper
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
Applied Mathematical Modelling
2018-10-09Paper
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
European Journal of Operational Research
2018-05-22Paper
Single machine scheduling problem with interval processing times to minimize mean weighted completion time
Computers & Operations Research
2016-11-10Paper
Total completion time with makespan constraint in no-wait flowshops with setup times
European Journal of Operational Research
2016-06-23Paper
Insider trading with product differentiation
Journal of Economics
2014-09-04Paper
Heuristics for no-wait flowshops with makespan subject to mean completion time
Applied Mathematics and Computation
2014-06-27Paper
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times
Computers & Mathematics with Applications
2010-12-14Paper
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
International Journal of Production Research
2010-10-25Paper
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
Computers & Mathematics with Applications
2010-06-28Paper


Research outcomes over time


This page was built for person: Harun Aydilek