| Publication | Date of Publication | Type |
|---|
| The container premarshalling problem under limited crane time: a constraint programming approach | 2024-07-08 | Paper |
| Mixed-Integer Programming vs. Constraint Programming for Shop Scheduling Problems: New Results and Outlook | 2024-03-22 | Paper |
| A constraint programming approach for the premarshalling problem | 2023-07-03 | Paper |
| A parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows | 2022-06-10 | Paper |
| Solving the generalized multi-port container stowage planning problem by a matheuristic algorithm | 2022-03-07 | Paper |
| Bi-objective parallel machine scheduling with additional resources during setups | 2021-06-07 | Paper |
| Mass casualty management in disaster scene: a systematic review of OR\&MS research in humanitarian operations | 2021-05-03 | Paper |
| Performance Analysis for Heterogeneous Cloud Servers Using Queueing Theory | 2020-10-02 | Paper |
| An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects | 2020-09-08 | Paper |
| Benders decomposition for the mixed no-idle permutation flowshop scheduling problem | 2020-08-31 | Paper |
| Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: a multi-objective approach | 2020-06-04 | Paper |
| Automatic algorithm design for hybrid flowshop scheduling problems | 2020-01-23 | Paper |
| A branch and bound approach for large pre-marshalling problems | 2019-06-25 | Paper |
| OR models in urban service facility location: a critical review of applications and future developments | 2019-02-25 | Paper |
| Integer programming models for the pre-marshalling problem | 2019-01-09 | Paper |
| Reformulations and an exact algorithm for unrelated parallel machine scheduling problems with setup times | 2018-12-03 | Paper |
| Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows | 2018-07-11 | Paper |
| Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources | 2018-05-29 | Paper |
| An iterated greedy heuristic for a market segmentation problem with multiple attributes | 2018-05-29 | Paper |
| Matheuristics for the irregular bin packing problem with free rotations | 2018-05-25 | Paper |
| A new vision of approximate methods for the permutation flowshop to minimise makespan: state-of-the-art and computational evaluation | 2018-05-24 | Paper |
| An effective heuristic for project scheduling with resource availability cost | 2018-05-24 | Paper |
| Heuristics for periodical batch job scheduling in a MapReduce computing framework | 2018-05-22 | Paper |
| Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization | 2017-02-03 | Paper |
| A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime | 2016-11-11 | Paper |
| A scatter search algorithm for the distributed permutation flowshop scheduling problem | 2016-06-24 | Paper |
| New hard benchmark for flowshop scheduling problems minimising makespan | 2016-06-23 | Paper |
| Local search methods for the flowshop scheduling problem with flowtime minimization | 2012-12-29 | Paper |
| Scheduling unrelated parallel machines with optional machines and jobs selection | 2012-11-15 | Paper |
| A review and evaluation of multiobjective algorithms for the flowshop scheduling problem | 2012-07-28 | Paper |
| Genetic algorithms with different representation schemes for complex hybrid flexible flow line problems | 2011-05-23 | Paper |
| New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness | 2010-11-07 | Paper |
| Shifting representation search for hybrid flexible flowline problems | 2010-09-09 | Paper |
| Iterated greedy local search methods for unrelated parallel machine scheduling | 2010-09-09 | Paper |
| Architecture of manufacturing scheduling systems: literature review and an integrated proposal | 2010-06-11 | Paper |
| The hybrid flow shop scheduling problem | 2010-03-18 | Paper |
| The distributed permutation flowshop scheduling problem | 2009-11-27 | Paper |
| Algorithms for a realistic variant of flowshop scheduling | 2009-10-15 | Paper |
| Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness | 2008-12-04 | Paper |
| Cooperative metaheuristics for the permutation flowshop scheduling problem | 2008-12-02 | Paper |
| Modeling realistic hybrid flexible flowshop scheduling problems | 2008-09-01 | Paper |
| Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics | 2008-09-01 | Paper |
| Some effective heuristics for no-wait flowshops with setup times to minimize total completion time | 2008-01-25 | Paper |
| An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives | 2008-01-21 | Paper |
| Local Search in Complex Scheduling Problems | 2007-11-29 | Paper |
| Considering scheduling and preventive maintenance in the flowshop sequencing problem | 2007-06-04 | Paper |
| A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem | 2006-12-14 | Paper |
| A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility | 2005-11-04 | Paper |
| Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics | 2005-05-12 | Paper |
| A comprehensive review and evaluation of permutation flowshop heuristics | 2005-04-21 | Paper |
| Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms | 2005-04-04 | Paper |
| A decision support system for a real vehicle routing problem. | 2004-02-02 | Paper |