| Publication | Date of Publication | Type |
|---|
| Optimizing emergency supply pre-positioning for disaster relief: a two-stage distributionally robust approach | 2024-07-08 | Paper |
| A branch-and-price algorithm for unrelated parallel machine scheduling with machine usage costs | 2024-07-02 | Paper |
| Logic-based benders decomposition for bi-objective parallel machine selection and job scheduling with release dates and resource consumption | 2024-06-06 | Paper |
| Multitasking scheduling with multiple rate‐modifying activities | 2023-11-16 | Paper |
| Robust optimization for spread quality and shortfall in guaranteed targeted display advertising planning | 2023-11-15 | Paper |
| A signomial programming-based approach for multi-echelon supply chain disruption risk assessment with robust dynamic Bayesian network | 2023-11-15 | Paper |
| Minimizing total completion time on non-identical parallel batch machines with arbitrary release times using ant colony optimization | 2023-07-10 | Paper |
| Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem | 2023-07-04 | Paper |
| Improved mixed-integer linear programming model and heuristics for bi-objective single-machine batch scheduling with energy cost consideration | 2022-12-23 | Paper |
| Parallel batch processing machines scheduling in cloud manufacturing for minimizing total service completion time | 2022-09-27 | Paper |
| Online leasing problem with price fluctuations and the second-hand transaction | 2022-07-18 | Paper |
| A branch, bound, and remember algorithm for the simple disassembly line balancing problem | 2019-02-19 | Paper |
| Coke production scheduling problem: a parallel machine scheduling with batch preprocessings and location-dependent processing times | 2019-02-14 | Paper |
| Availability optimization of a redundant system through dependency modeling | 2018-12-17 | Paper |
| Multitasking scheduling problems with deterioration effect | 2018-11-05 | Paper |
| An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing | 2018-10-30 | Paper |
| Combined cutting stock and lot-sizing problem with pattern setup | 2018-07-11 | Paper |
| Dynamic lot-sizing models with pricing for new products | 2018-05-29 | Paper |
| Bi-objective optimization of single-machine batch scheduling under time-of-use electricity prices | 2017-01-12 | Paper |
| Dual-mode production planning for manufacturing with emission constraints | 2016-10-07 | Paper |
| Approximation algorithm for uniform quay crane scheduling at container ports | 2016-07-08 | Paper |
| Reciprocal supply chain with intention | 2016-06-24 | Paper |
| Robust optimization for the cyclic hoist scheduling problem | 2016-06-23 | Paper |
| Optimal Semi-Online Algorithm for Scheduling on Two Parallel Batch Processing Machines | 2014-11-24 | Paper |
| Lagrangian relaxation and column generation-based lower bounds for the \(\text{Pm},h_{j1}\parallel \sum w_iC_i\) scheduling problem | 2014-11-13 | Paper |
| Optimal selection of retailers for a manufacturing vendor in a vendor managed inventory system | 2014-07-27 | Paper |
| Online parallel machine scheduling to maximize the number of early jobs | 2013-06-11 | Paper |
| OPTIMAL SEMI-ONLINE ALGORITHMS FOR m-BATCH-MACHINE FLOW SHOP SCHEDULING | 2013-01-24 | Paper |
| Large scale stochastic inventory routing problems with~split delivery and service level constraints | 2012-11-15 | Paper |
| Single-machine scheduling with past-sequence-dependent delivery times and release times | 2012-10-23 | Paper |
| SCHEDULING DETERIORATING JOBS ON A SINGLE MACHINE WITH RELEASE TIMES AND REJECTION | 2012-10-15 | Paper |
| New results on single-machine scheduling with past-sequence-dependent delivery times | 2012-08-08 | Paper |
| An FPTAS for uniform machine scheduling to minimize makespan with linear deterioration | 2012-07-17 | Paper |
| An optimal online algorithm for single machine scheduling to minimize total general completion time | 2012-05-23 | Paper |
| Optimal algorithms for online scheduling on parallel machines to minimize the makespan with a periodic availability constraint | 2011-10-10 | Paper |
| Infinite split scheduling: a new lower bound of total weighted completion time on parallel machines with job release dates and unavailability periods | 2011-04-08 | Paper |
| Semi-online scheduling on 2 machines under a grade of service provision with bounded processing times | 2011-02-18 | Paper |
| A lower bound for weighted completion time variance | 2010-12-20 | Paper |
| ONLINE SCHEDULING OF PARALLEL JOBS WITH BOUNDED PROCESSING TIMES ON TWO MACHINES | 2010-12-15 | Paper |
| Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times | 2010-10-26 | Paper |
| A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows | 2010-10-25 | Paper |
| Online Scheduling on Two Uniform Machines to Minimize the Makespan with a Periodic Availability Constraint | 2010-07-20 | Paper |
| An optimal online algorithm for two-machine open shop preemptive scheduling with bounded processing times | 2010-05-03 | Paper |
| Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times | 2009-12-07 | Paper |
| Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots | 2009-12-07 | Paper |
| An optimal online algorithm for single machine scheduling with bounded delivery times | 2009-11-17 | Paper |
| Online scheduling to minimize modified total tardiness with an availability constraint | 2009-11-06 | Paper |
| OPTIMAL SEMI-ONLINE ALGORITHM FOR SCHEDULING ON A BATCH PROCESSING MACHINE | 2009-09-22 | Paper |
| Online scheduling on \(m\) uniform machines to minimize total (weighted) completion time | 2009-09-10 | Paper |
| Optimal Semi-online Algorithm for Scheduling on a Batch Processing Machine | 2009-07-07 | Paper |
| Online scheduling on two uniform machines to minimize the makespan | 2009-05-28 | Paper |
| Optimisation hybride par colonies de fourmis pour le problème de découpe à deux dimensions | 2009-04-23 | Paper |
| Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm | 2008-11-24 | Paper |
| A branch-and-bound algorithm to minimize total weighted completion time on identical parallel machines with job release dates | 2008-09-01 | Paper |
| Characterization and modelling of guillotine constraints | 2008-06-24 | Paper |
| Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period | 2008-01-21 | Paper |
| The study of a dynamic dial-a-ride problem under time-dependent and stochastic environments | 2007-10-25 | Paper |
| Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times | 2007-10-19 | Paper |
| Cyclic hoist scheduling in large real-life electroplating lines | 2007-08-20 | Paper |
| A faster polynomial algorithm for 2-cyclic robotic scheduling | 2007-05-15 | Paper |
| An exact method for \(Pm/sds, r_{i}/ \sum^{n}_{i=1} C_{i}\) problem | 2007-04-13 | Paper |
| A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness | 2007-02-26 | Paper |
| Cyclic multiple-robot scheduling with time-window constraints using a critical path approach | 2006-12-07 | Paper |
| A fast heuristic for solving a large-scale static dial-a-ride problem under complex constraints | 2006-09-13 | Paper |
| Some dominance properties for single-machine tardiness problems with sequence-dependent setup | 2006-08-28 | Paper |
| Évaluation de la fiabilité d'un système de prévision de la demande dans le cas d'une politique de regroupement des besoins | 2006-07-11 | Paper |
| A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line | 2005-06-01 | Paper |
| Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach | 2005-04-26 | Paper |
| Preemptive scheduling with availability constraints to minimize total weighted completion times | 2005-04-22 | Paper |
| Quasi-variational equation | 2004-05-27 | Paper |
| A polynomial algorithm for 2-degree cyclic robot scheduling | 2003-04-10 | Paper |
| Approximation Algorithms to Solve Real-Life Multicriteria Cutting Stock Problems | 2002-10-30 | Paper |
| A survey of the state-of-the-art of common due date assignment and scheduling research | 2002-06-16 | Paper |
| https://portal.mardi4nfdi.de/entity/Q2784173 | 2002-04-17 | Paper |
| Variable-sized bin packing: Tight absolute worst-case performance ratios for four approximation algorithms | 2001-06-21 | Paper |
| Improving job-shop schedules through critical pairwise exchanges | 2001-01-02 | Paper |
| The cutting stock problem with mixed objectives: Two heuristics based on dynamic programming | 1999-08-02 | Paper |
| Heuristic approaches for \(n/m/F/\sum C_i\) scheduling problems | 1999-02-22 | Paper |
| Heuristic procedures for minimizing makespan and the number of required pallets | 1998-07-14 | Paper |
| A new class of scheduling criteria and their optimization | 1997-01-07 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4763601 | 1996-03-18 | Paper |
| Supply management in assembly systems | 1994-04-19 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4017560 | 1993-01-16 | Paper |
| Some new efficient methods to solve the \(n/1/r_ i/\sum{}T_ i\) scheduling problem | 1993-01-16 | Paper |
| Efficient heuristics to minimize total flow time with release dates | 1993-01-04 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3993992 | 1992-08-13 | Paper |
| Simulation studies in JIT production | 1992-01-01 | Paper |