Ada Che

From MaRDI portal
Person:300029

Available identifiers

zbMath Open che.adaMaRDI QIDQ300029

List of research outcomes





PublicationDate of PublicationType
Optimizing emergency supply pre-positioning for disaster relief: a two-stage distributionally robust approach2024-07-08Paper
A multi-level capacitated arc routing problem with intermediate facilities in waste collection2024-07-08Paper
Collection-disassembly-delivery problem of disassembly centers in a reverse logistics network2024-06-14Paper
Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint2023-07-21Paper
Bi-objective scheduling on uniform parallel machines considering electricity cost2022-12-23Paper
Improved mixed-integer linear programming model and heuristics for bi-objective single-machine batch scheduling with energy cost consideration2022-12-23Paper
A bi-objective decision model and method for the integrated optimization of bus line planning and Lane reservation2022-07-18Paper
Nash-equilibrium algorithm and incentive protocol for a decentralized decision and scheduling problem in sustainable electroplating plants2021-05-21Paper
Energy-efficient bi-objective single-machine scheduling with power-down mechanism2018-07-11Paper
Novel integer linear programming models for the facility layout problem with fixed-size rectangular departments2018-07-11Paper
An efficient bicriteria algorithm for stable robotic flow shop scheduling2018-05-29Paper
Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance2016-11-17Paper
Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance2016-11-10Paper
Robust optimization for the cyclic hoist scheduling problem2016-06-23Paper
Design of a multiobjective reverse logistics network considering the cost and service level2013-06-11Paper
A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints2012-12-07Paper
Cyclic scheduling in robotic flowshops with bounded work-in-process levels2011-04-29Paper
A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell2011-03-25Paper
Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times2010-10-26Paper
A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows2010-10-25Paper
Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots2009-12-07Paper
A note on a quadratic algorithm for the 2-cyclic robotic scheduling problem2009-11-06Paper
Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm2008-11-24Paper
Cyclic hoist scheduling in large real-life electroplating lines2007-08-20Paper
A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line2005-06-01Paper
Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach2005-04-26Paper
A polynomial algorithm for 2-degree cyclic robot scheduling2003-04-10Paper
https://portal.mardi4nfdi.de/entity/Q39340661981-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38935481980-01-01Paper

Research outcomes over time

This page was built for person: Ada Che