Frank Meisel

From MaRDI portal
Person:319437

Available identifiers

zbMath Open meisel.frankMaRDI QIDQ319437

List of research outcomes





PublicationDate of PublicationType
An economic analysis of introducing autonomous ships in a short‐sea liner shipping network2023-11-21Paper
A MIP-based heuristic for a single trade routing and scheduling problem in roll-on roll-off shipping2022-09-27Paper
A time-dependent vessel routing problem with speed optimization2022-07-22Paper
Interrelated trips in the rural dial-a-ride problem with autonomous vehicles2022-06-10Paper
The aquaculture service vessel routing problem with time dependent travel times and synchronization constraints2022-03-09Paper
A multi-period analysis of the integrated item-sharing and crowdshipping problem2021-06-07Paper
Robust Optimization Approaches for Routing and Scheduling of Multi-Skilled Teams under Uncertain Job Skill Requirements2020-09-09Paper
An exact solution method for the capacitated item-sharing and crowdshipping problem2019-07-05Paper
A multi-period multi-commodity lot-sizing problem with supplier selection, storage selection and discounts for the process industry2019-07-05Paper
Scheduling two-way ship traffic for the Kiel Canal: model, extensions and a matheuristic2019-03-27Paper
A generalized classification scheme for crane scheduling with interference2018-02-16Paper
Ambulance routing for disaster response with patient groups2016-11-10Paper
A follow-up survey of berth allocation and quay crane scheduling problems in container terminals2016-10-06Paper
Workforce routing and scheduling for electricity network maintenance with downtime minimization2015-07-29Paper
Spatial and temporal synchronization of vehicles in logistics networks2015-03-03Paper
Synchronized routing of active and passive means of transport2014-06-13Paper
Modeling and solving rich quay crane scheduling problems2012-11-15Paper
The quay crane scheduling problem with time windows2012-06-18Paper
The Berth Allocation Problem with a Cut-and-Run Option2011-04-07Paper
A fast heuristic for quay crane scheduling with interference constraints2010-03-08Paper
A survey of berth allocation and quay crane scheduling problems in container terminals2009-11-27Paper

Research outcomes over time

This page was built for person: Frank Meisel