Udo Buscher

From MaRDI portal
Person:319650

Available identifiers

zbMath Open buscher.udoMaRDI QIDQ319650

List of research outcomes





PublicationDate of PublicationType
Minimizing the earliness-tardiness for the customer order scheduling problem in a dedicated machine environment2025-01-07Paper
Classifying ready-for-transfer patients in the intensive care unit based on clinical data2024-09-17Paper
The dynamic facility location problem with mobile production units: a waste recycling application2024-07-08Paper
A systematic review of multi-objective hybrid flow shop scheduling2023-07-10Paper
The vehicle routing problem with drones and drone speed selection2023-07-04Paper
Optimal price and quality decisions of a supply chain game considering imperfect quality items and market segmentation2021-12-08Paper
An efficient column generation approach for practical railway crew scheduling with attendance rates2021-06-07Paper
Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization2021-04-20Paper
Railway crew scheduling: models, methods and applications2020-01-23Paper
A comprehensive review of flowshop group scheduling literature2018-07-12Paper
A study of hybrid evolutionary algorithms for single machine scheduling problem with sequence-dependent setup times2016-11-10Paper
Single row layout models2016-10-06Paper
Game theoretic analysis of pricing and vertical cooperative advertising of a retailer-duopoly with a common manufacturer2016-07-06Paper
Cooperative advertising models in supply chain management: a review2015-02-19Paper
A Genetic Algorithm for the Unequal Area Facility Layout Problem2015-02-12Paper
A note on ``Quality investment and inspection policy in a supplier-manufacturer supply chain2015-02-03Paper
Flow shop batching and scheduling with sequence-dependent setup times2015-01-22Paper
A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups2015-01-22Paper
Vertical cooperative advertising and pricing decisions in a manufacturer-retailer supply chain: a game-theoretic approach2014-07-27Paper
An iterative approach for the serial batching problem with parallel machines and job families2013-09-03Paper
Solving the serial batching problem in job shop manufacturing systems2012-12-29Paper
Solving the Batch Scheduling Problem with Family Setup Times2011-04-07Paper
MIP formulations and heuristics for solving parallel batching problems2011-04-05Paper
A note on: an optimal batch size for an imperfect production system with quality assurance and rework2010-11-07Paper
An integrated tabu search algorithm for the lot streaming problem in job shops2009-12-07Paper
https://portal.mardi4nfdi.de/entity/Q53017112009-01-20Paper
Optimizing a production system with rework and equal sized batch shipments2006-11-15Paper
Ensuring feasibility in ‘a generalized quantity discount pricing model to increase supplier's profits’2005-04-04Paper
https://portal.mardi4nfdi.de/entity/Q47898972003-01-27Paper
A branch-and-cut algorithm for vehicle routing problems with three-dimensional loading constraintsN/APaper

Research outcomes over time

This page was built for person: Udo Buscher