Stanley Gershwin

From MaRDI portal
Person:320642

Available identifiers

zbMath Open gershwin.stanley-bMaRDI QIDQ320642

List of research outcomes





PublicationDate of PublicationType
Evaluating the performance of look-ahead policies for upstream serial processor with downstream batch processor serving incompatible job families and finite buffer sizes2017-05-31Paper
Modelling and analysis of a multi-stage system involving batch processors with incompatible job families2017-05-31Paper
Stability of Prioritized Scheduling Policies in Manufacturing Systems With Setup Times2017-05-16Paper
The impact of false-negative reads on the performance of RFID-based shelf inventory control policies2016-11-10Paper
Part sojourn time distribution in a two-machine line2016-10-07Paper
A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines2013-11-25Paper
Discrete time model for two-machine one-buffer transfer lines with restart policy2013-11-25Paper
Controlling job arrivals with processing time windows into batch processor buffer2012-03-09Paper
Subdivision-based digital geometry processing as a fundamental building block of digital manufacturing2011-07-06Paper
Modelling and analysis of Markovian continuous flow systems with a finite buffer2011-04-08Paper
An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers2008-02-25Paper
Integrated quality and quantity modeling of a production line2005-12-14Paper
Production and subcontracting strategies for manufacturers with limited capacity and volatile demand2004-03-15Paper
Efficient algorithms for buffer space allocation2000-06-07Paper
A decomposition method for analyzing inhomogeneous assembly/disassembly systems2000-06-07Paper
A real-time dynamic lot-sizing heuristic for a manufacturing system subject to random setup times1999-04-26Paper
Manufacturing flow line systems: A review of models and analytical results1993-04-01Paper
Dynamic setup scheduling and flow control in manufacturing systems1992-06-28Paper
Scheduling job shops with delays1991-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37862591988-01-01Paper
An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking1987-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33437321984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36838561984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33379231984-01-01Paper
Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers1983-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33372031982-01-01Paper
Dynamic model-based techniques for the detection of incidents on freeways1980-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38634131979-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38634091979-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38634001979-01-01Paper
Perturbation strategies for optimal traffic reassignment1979-01-01Paper
The uncertainty threshold principle: Some fundamental limitations of optimal decision making under dynamic uncertainty1977-01-01Paper
On the higher derivatives of Bellman's equation1969-01-01Paper

Research outcomes over time

This page was built for person: Stanley Gershwin