S. Kedad-Sidhoum

From MaRDI portal
Person:320790

Available identifiers

zbMath Open kedad-sidhoum.safiaMaRDI QIDQ320790

List of research outcomes





PublicationDate of PublicationType
Optimization of battery management in telecommunications networks under energy market incentives2024-09-03Paper
On the continuity assumption of "Finite Adaptability in Multistage Linear Optimization by Bertsimas and Caramanis2023-05-09Paper
Reinforcement learning for variable selection in a branch and bound algorithm2022-12-21Paper
Combining Polyhedral Approaches and Stochastic Dual Dynamic Integer Programming for Solving the Uncapacitated Lot-Sizing Problem Under Uncertainty2022-06-30Paper
Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories2022-05-20Paper
Dominance inequalities for scheduling around an unrestrictive common due date2021-11-09Paper
Coordination of a two-level supply chain with contracts2021-08-09Paper
Mixed integer formulations using natural variables for single machine scheduling around a common due date2021-01-13Paper
A multi-stage stochastic integer programming approach for a multi-echelon lot-sizing problem with returns and lost sales2020-01-27Paper
Single-machine common due date total earliness/tardiness scheduling with machine unavailability2020-01-22Paper
Two-level lot-sizing with inventory bounds2019-01-14Paper
The unit-capacity constrained permutation problem2018-05-30Paper
A Family of Scheduling Algorithms for Hybrid Parallel Platforms2018-05-14Paper
Just-in-Time Planning and Lot-Sizing2017-02-03Paper
Machine reassignment problem: the ROADEF/EURO challenge 20122016-11-07Paper
The single-item green lot-sizing problem with fixed carbon emissions2016-10-07Paper
Valid inequalities for the synchronization bus timetabling problem2016-10-07Paper
Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory2015-10-19Paper
A study of scheduling problems with preemptions on multi-core computers with GPU accelerators2015-09-30Paper
Performance guarantees for a scheduling problem with common stepwise job payoffs2014-12-02Paper
Batch sizing and just-in-time scheduling with common due date2014-09-26Paper
Lot sizing with carbon emission constraints2014-07-27Paper
Lagrangean Heuristic for a Multi-Plant Lot-Sizing Problem with Transfer and Storage Capacities2014-02-24Paper
Single machine scheduling with delivery dates and cumulative payoffs2014-02-05Paper
Integrated batch sizing and scheduling on a single machine2014-02-05Paper
Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales2011-05-10Paper
An exact algorithm for solving the ring star problem2010-04-21Paper
Fast neighborhood search for the single machine earliness-tardiness scheduling problem2010-03-19Paper
A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem2009-08-28Paper
The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs2009-06-18Paper
MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs2009-02-03Paper
Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates2008-04-24Paper
The one-machine problem with earliness and tardiness penalties2007-12-20Paper
The multi-item capacitated lot-sizing problem with setup times and shortage costs2007-12-10Paper

Research outcomes over time

This page was built for person: S. Kedad-Sidhoum