| Publication | Date of Publication | Type |
|---|
| Real-time schedule adjustments for conflict-free vehicle routing | 2024-07-08 | Paper |
| Ejection chain moves for automatic neighborhood synthesis in constrained cardinality‐minimization problems | 2023-11-17 | Paper |
| A learn‐and‐construct framework for general mixed‐integer programming problems | 2023-11-16 | Paper |
| A scalable anticipatory policy for the dynamic pickup and delivery problem | 2022-09-27 | Paper |
| Recovering feasibility in real-time conflict-free vehicle routing | 2022-09-20 | Paper |
| A multimodal tourist trip planner integrating road and pedestrian networks | 2022-06-30 | Paper |
| On path ranking in time-dependent graphs | 2022-03-09 | Paper |
| The multi-period \(p\)-center problem with time-dependent travel times | 2022-03-09 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4999375 | 2021-07-06 | Paper |
| On path ranking in time-dependent graphs | 2020-09-16 | Paper |
| The multi-period $p$-center problem with time-dependent travel times | 2019-12-21 | Paper |
| An enhanced lower bound for the time-dependent travelling salesman problem | 2019-11-11 | Paper |
| Comments on: ``Perspectives on integer programming for time-dependent models | 2019-07-11 | Paper |
| Time-dependent asymmetric traveling salesman problem with time windows: properties and an exact algorithm | 2019-05-17 | Paper |
| A branch-and-bound algorithm for the time-dependent rural postman problem | 2018-12-03 | Paper |
| MIP neighborhood synthesis through semantic feature extraction and automatic algorithm configuration | 2018-07-11 | Paper |
| The time-dependent quickest path problem: Properties and bounds | 2018-05-23 | Paper |
| Single-machine time-dependent scheduling problems with fixed rate-modifying activities and resumable jobs | 2017-08-24 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5271452 | 2017-07-11 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5271463 | 2017-07-11 | Paper |
| Approximation neighborhood evaluation for the design of the logistics support of complex engineering systems | 2017-03-24 | Paper |
| Time-dependent routing problems: a review | 2016-11-17 | Paper |
| A lower bound for the quickest path problem | 2016-11-10 | Paper |
| Model-based automatic neighborhood design by unsupervised learning | 2016-11-10 | Paper |
| Probabilistic model and solution algorithm for the electricity retailers in the Italian market | 2013-12-11 | Paper |
| The capacitated plant location problem with multiple facilities in the same site | 2013-03-25 | Paper |
| Solving the Job Sequencing and Tool Switching Problem as a nonlinear least cost Hamiltonian cycle problem | 2010-11-24 | Paper |
| EFFICIENT NEIGHBORHOOD SEARCH FOR THE PROBABILISTIC MULTI-VEHICLE PICKUP AND DELIVERY PROBLEM | 2010-08-11 | Paper |
| Ant colony optimization for the arc routing problem with intermediate facilities under capacity and length restrictions | 2010-04-21 | Paper |
| The Black and White Traveling Salesman Problem | 2009-08-13 | Paper |
| The lane covering problem with time windows | 2008-07-11 | Paper |
| Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs | 2008-04-28 | Paper |
| New policies for the dynamic traveling salesman problem | 2007-11-16 | Paper |
| A combined procedure for discrete simulation-optimization problems based on the simulated annealing framework | 2007-10-24 | Paper |
| Integrated shipment dispatching and packing problems: a case study | 2007-06-21 | Paper |
| Improved formulation, branch-and-cut and tabu search heuristic for single loop material flow system design | 2006-12-14 | Paper |
| Fix and relax heuristic for a stochastic lot-sizing problem | 2006-09-28 | Paper |
| A constructive heuristic for the undirected rural postman problem | 2006-06-30 | Paper |
| A taboo search heuristic for the optimisation of a multistage component placement system | 2006-01-13 | Paper |
| Efficient neighborhood search for the Probabilistic Pickup and Delivery Travelling Salesman Problem | 2005-08-05 | Paper |
| Batch scheduling in a two-stage flow shop with parallel and bottleneck machines | 2005-06-21 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4668751 | 2005-04-15 | Paper |
| The laser-plotter beam routing problem | 2005-03-16 | Paper |
| Tabu search heuristics for the arc routing problem with intermediate facilities under capacity and length restrictions | 2005-01-17 | Paper |
| A heuristic for the periodic rural postman problem | 2004-11-12 | Paper |
| Allocating production batches to subcontractors by fuzzy goal programming | 2004-08-10 | Paper |
| Solving the hierarchical Chinese postman problem as a rural postman problem. | 2004-03-14 | Paper |
| Real-time vehicle routing: Solution concepts, algorithms and parallel computing strategies. | 2003-09-07 | Paper |
| The Arc Routing and Scheduling Problem with Transshipment | 2003-06-29 | Paper |
| The capacitated arc routing problem with intermediate facilities | 2002-03-24 | Paper |
| A Lagrangean heuristic for the plant location problem with multiple facilities in the same site | 2002-01-01 | Paper |
| A multi-modal approach to the location of a rapid transit line | 2001-02-22 | Paper |
| An algorithm for the hierarchical Chinese postman problem | 2000-12-12 | Paper |
| A branch-and-cut algorithm for the undirected rural postman problem | 2000-08-14 | Paper |
| An efficient transformation of the generalized vehicle routing problem | 2000-03-23 | Paper |
| Eulerian location problems | 2000-01-30 | Paper |