J. Behnamian

From MaRDI portal
Person:337205

Available identifiers

zbMath Open behnamian.javadMaRDI QIDQ337205

List of research outcomes





PublicationDate of PublicationType
A hyper-heuristic for distributed parallel machine scheduling with machine-dependent processing and sequence-dependent setup times2024-02-02Paper
Multi-product production routing problem by consideration of outsourcing and carbon emissions: particle swarm optimization2023-10-10Paper
Hyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production quality2023-10-10Paper
Fuzzy cleaner production in assembly flexible job-shop scheduling with machine breakdown and batch transportation: Lagrangian relaxation2023-07-06Paper
Multi-objective outpatient scheduling in health centers considering resource constraints and service quality: a robust optimization approach2023-04-14Paper
Location and transportation of intermodal Hazmat considering equipment capacity and congestion impact: elastic method and sub-population genetic algorithm2022-09-24Paper
Multi-fleet feeder vehicle routing problem using hybrid metaheuristic2022-03-09Paper
Multi-objective multi-factory scheduling2021-07-27Paper
Single-item lot-based supplying and batch production under a bilateral capacity reservation: A partnership structure2021-07-27Paper
A scenario-based robust optimization with a pessimistic approach for nurse rostering problem2021-05-11Paper
Matheuristic for the decentralized factories scheduling problem2020-01-27Paper
Survey on fuzzy shop scheduling2018-10-16Paper
Decomposition based hybrid VNS-TS algorithm for distributed parallel factories scheduling with virtual corporation2016-11-10Paper
The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine2014-08-01Paper
Two-machine flow shop total tardiness scheduling problem with deteriorating jobs2013-01-13Paper
Realistic two-stage flowshop batch scheduling problems with transportation capacity and times2012-04-21Paper
Hybrid flowshop scheduling with machine and resource-dependent processing times2011-05-10Paper
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times2010-10-26Paper
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling2010-10-25Paper

Research outcomes over time

This page was built for person: J. Behnamian