J. Behnamian

From MaRDI portal
Person:337205

Available identifiers

zbMath Open behnamian.javadMaRDI QIDQ337205

List of research outcomes

PublicationDate of PublicationType
A hyper-heuristic for distributed parallel machine scheduling with machine-dependent processing and sequence-dependent setup times2024-02-02Paper
Multi-product production routing problem by consideration of outsourcing and carbon emissions: particle swarm optimization2023-10-10Paper
Hyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production quality2023-10-10Paper
Fuzzy cleaner production in assembly flexible job-shop scheduling with machine breakdown and batch transportation: Lagrangian relaxation2023-07-06Paper
Multi-objective outpatient scheduling in health centers considering resource constraints and service quality: a robust optimization approach2023-04-14Paper
Location and transportation of intermodal Hazmat considering equipment capacity and congestion impact: elastic method and sub-population genetic algorithm2022-09-24Paper
Multi-fleet feeder vehicle routing problem using hybrid metaheuristic2022-03-09Paper
Multi-objective multi-factory scheduling2021-07-27Paper
Single-item lot-based supplying and batch production under a bilateral capacity reservation: A partnership structure2021-07-27Paper
A scenario-based robust optimization with a pessimistic approach for nurse rostering problem2021-05-11Paper
Matheuristic for the decentralized factories scheduling problem2020-01-27Paper
Survey on fuzzy shop scheduling2018-10-16Paper
Decomposition based hybrid VNS-TS algorithm for distributed parallel factories scheduling with virtual corporation2016-11-10Paper
The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine2014-08-01Paper
Two-machine flow shop total tardiness scheduling problem with deteriorating jobs2013-01-13Paper
Realistic two-stage flowshop batch scheduling problems with transportation capacity and times2012-04-21Paper
Hybrid flowshop scheduling with machine and resource-dependent processing times2011-05-10Paper
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times2010-10-26Paper
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling2010-10-25Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: J. Behnamian