| Publication | Date of Publication | Type |
|---|
| Objective-based counterfactual explanations for linear discrete optimization | 2023-10-04 | Paper |
| The LM-Cut Heuristic Family for Optimal Numeric Planning with Simple Conditions | 2023-01-09 | Paper |
| CP and hybrid models for two-stage batching and scheduling | 2022-12-21 | Paper |
| An Ising framework for constrained clustering on special purpose hardware | 2022-12-21 | Paper |
| A combinatorial cut-and-lift procedure with an application to 0-1 second-order conic programming | 2022-11-14 | Paper |
| Decision Diagrams for Discrete Optimization: A Survey of Recent Advances | 2022-09-19 | Paper |
| Packing by scheduling: using constraint programming to solve a complex 2D cutting stock problem | 2022-08-30 | Paper |
| Model-based approaches to multi-attribute diverse matching | 2022-08-30 | Paper |
| Heavy-tails and randomized restarting beam search in goal-oriented neural sequence decoding | 2022-03-21 | Paper |
| An MDD-Based Lagrangian Approach to the Multicommodity Pickup-and-Delivery TSP | 2021-01-07 | Paper |
| Solving Delete Free Planning with Relaxed Decision Diagram Based Heuristics | 2020-05-14 | Paper |
| A constraint programming approach to electric vehicle routing with time windows | 2019-10-14 | Paper |
| Autonomous Target Search with Multiple Coordinated UAVs | 2019-09-13 | Paper |
| Modelling and solving the senior transportation problem | 2018-11-21 | Paper |
| Intruder alert! Optimization models for solving the mobile robot graph-clear problem | 2018-11-08 | Paper |
| Mathematical programming models for optimizing partial-order plan flexibility | 2018-07-12 | Paper |
| Multi-stage resource-aware scheduling for data centers with heterogeneous servers | 2018-04-13 | Paper |
| \(\mathbb{Q}\)-bounds consistency for the \textsc{spread} constraint with variable mean | 2017-08-16 | Paper |
| Mixed integer programming models for job shop scheduling: A computational analysis | 2016-11-17 | Paper |
| Optimal partial-order plan relaxation via MaxSAT | 2016-09-21 | Paper |
| Combining Constraint Propagation and Discrete Ellipsoid-Based Search to Solve the Exact Quadratic Knapsack Problem | 2016-07-25 | Paper |
| Using logic-based Benders decomposition to solve the capacity- and distance-constrained plant location problem | 2016-06-29 | Paper |
| Logic-Based Decomposition Methods for the Travelling Purchaser Problem | 2016-06-27 | Paper |
| Decomposition methods for the parallel machine scheduling problem with setups | 2016-05-19 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3455613 | 2015-12-11 | Paper |
| A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines | 2015-11-12 | Paper |
| Solving wind farm layout optimization with mixed integer programs and constraint programs | 2015-01-28 | Paper |
| Using dual presolving reductions to reformulate cumulative constraints | 2015-01-22 | Paper |
| Integrating Queueing Theory and Scheduling for Dynamic Scheduling Problems | 2014-07-30 | Paper |
| A New MIP Model for Parallel-Batch Scheduling with Non-identical Job Sizes | 2014-05-27 | Paper |
| Combining Discrete Ellipsoid-Based Search and Branch-and-Cut for Binary Quadratic Programming Problems | 2014-05-27 | Paper |
| Scheduling a Dynamic Aircraft Repair Shop with Limited Repair Resources | 2013-06-20 | Paper |
| Solving Wind Farm Layout Optimization with Mixed Integer Programming and Constraint Programming | 2013-06-04 | Paper |
| Recent Improvements Using Constraint Integer Programming for Resource Allocation and Scheduling | 2013-06-04 | Paper |
| Reconsidering Mixed Integer Programming and MIP-Based Hybrids for Scheduling | 2012-08-22 | Paper |
| Combining constraint programming and local search for job-shop scheduling | 2012-07-28 | Paper |
| A constraint programming approach for solving a queueing design and control problem | 2012-07-28 | Paper |
| A global constraint for total weighted completion time for unary resources | 2011-04-06 | Paper |
| A theoretic and practical framework for scheduling in a stochastic environment | 2010-03-08 | Paper |
| Principles for the design of large neighborhood search | 2010-02-01 | Paper |
| An extended queueing control model for facilities with front room and back room operations and mixed-skilled workers | 2009-06-30 | Paper |
| Solution-guided multi-point constructive search for job shop scheduling | 2009-04-28 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3624130 | 2009-04-28 | Paper |
| Scheduling with uncertain durations: Modeling \(\beta \)-robust scheduling with constraints | 2009-04-03 | Paper |
| A Global Constraint for Total Weighted Completion Time | 2009-03-10 | Paper |
| Solving a Stochastic Queueing Control Problem with Constraint Programming | 2009-03-10 | Paper |
| Multi-point Constructive Search | 2008-09-09 | Paper |
| Principles and Practice of Constraint Programming – CP 2004 | 2008-09-09 | Paper |
| A Hybrid Constraint Programming / Local Search Approach to the Job-Shop Scheduling Problem | 2008-05-27 | Paper |
| Fitness-Distance Correlation and Solution-Guided Multi-point Constructive Search for CSPs | 2008-05-27 | Paper |
| A case study of mutual routing-scheduling reformulation | 2007-05-15 | Paper |
| Problem difficulty for tabu search in job-shop scheduling | 2006-02-07 | Paper |
| Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems | 2005-12-27 | Paper |
| Recent Advances in Constraints | 2005-11-11 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4737601 | 2004-08-11 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4438765 | 2003-12-10 | Paper |
| A hybrid approach to scheduling with earliness and tardiness costs | 2003-03-10 | Paper |
| Heuristics for scheduling with inventory: Dynamic focus via constraint criticality | 2002-04-29 | Paper |
| Introduction to the special issue on industrial constraint-directed scheduling | 2001-09-03 | Paper |
| Constraint-directed techniques for scheduling alternative activities | 2000-10-26 | Paper |
| Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics | 2000-06-04 | Paper |
| The ODO project: Toward a unified basis for constraint-directed scheduling | 1999-01-11 | Paper |
| Domain-Independent Dynamic Programming and Constraint Programming Approaches for Assembly Line Balancing Problems with Setups | N/A | Paper |