| Publication | Date of Publication | Type |
|---|
| A new hybrid reliability sampling system for exponential lifetime distributions | 2024-08-02 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5889131 | 2023-04-27 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5889556 | 2023-04-27 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5889136 | 2023-04-27 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5889539 | 2023-04-27 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5889682 | 2023-04-27 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5889661 | 2023-04-27 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5889667 | 2023-04-27 | Paper |
| Generalized multiple dependent state sampling plans for coefficient of variation | 2022-09-14 | Paper |
| A new variable control chart under generalized multiple dependent state sampling | 2022-07-04 | Paper |
| A EWMA control chart based on an auxiliary variable and repetitive sampling for monitoring process location | 2022-07-01 | Paper |
| Multiple dependent state repetitive sampling plans with or without auxiliary variable | 2022-06-30 | Paper |
| A new multiple dependent state sampling plan based on the process capability index | 2022-06-21 | Paper |
| A variable sampling plan using generalized multiple dependent state based on a one-sided process capability index | 2022-06-21 | Paper |
| Determination and economic design of a generalized multiple dependent state sampling plan | 2022-06-21 | Paper |
| A new control chart using GINI CPK | 2022-05-25 | Paper |
| Analysis of process yield in a cost-effective double acceptance sampling plan | 2022-05-20 | Paper |
| A mixed double sampling plan based on Cpk | 2022-05-18 | Paper |
| A mixed control chart for monitoring failure times under accelerated hybrid censoring | 2022-03-01 | Paper |
| Design of acceptance sampling plan using a modified EWMA statistic | 2021-10-28 | Paper |
| Optimal designing of an SkSP-R double sampling plan | 2021-10-01 | Paper |
| Regularization-based model tree for multi-output regression | 2021-03-18 | Paper |
| A control chart for multivariate Poisson distribution using repetitive sampling | 2020-12-04 | Paper |
| A newS2control chart using repetitive sampling | 2020-11-04 | Paper |
| A double acceptance sampling plan for generalized log-logistic distributions with known shape parameters | 2020-09-29 | Paper |
| A variables repetitive group sampling plan under failure-censored reliability tests for Weibull distribution | 2020-09-29 | Paper |
| Design of a time-truncated double sampling plan for a general life distribution | 2020-09-29 | Paper |
| Designing of a variables two-plan system by minimizing the average sample number | 2020-09-28 | Paper |
| A group acceptance sampling plan for truncated life test having Weibull distribution | 2020-09-28 | Paper |
| Design of SkSP-R Variables Sampling Plans | 2020-06-21 | Paper |
| A control chart for COM-Poisson distribution using a modified EWMA statistic | 2020-04-22 | Paper |
| A control chart for time truncated life tests using Pareto distribution of second kind | 2020-04-01 | Paper |
| A control chart using an auxiliary variable and repetitive sampling for monitoring process mean | 2020-04-01 | Paper |
| A new variable sample size control chart using MDS sampling | 2020-04-01 | Paper |
| An exponentially weighted moving average chart controlling false discovery rate | 2020-03-11 | Paper |
| Design of a new variable Shewhart control chart using multiple dependent state repetitive sampling | 2019-11-13 | Paper |
| Biclustering of ARMA time series | 2018-11-19 | Paper |
| Multiple states repetitive group sampling plans with process loss consideration | 2018-10-10 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4682548 | 2018-09-18 | Paper |
| The efficacy of process capability indices using median absolute deviation and their bootstrap confidence intervals | 2018-06-14 | Paper |
| Bootstrap confidence intervals of generalized process capability indexCpykfor Lindley and power Lindley distributions | 2018-06-01 | Paper |
| Multiple dependent state repetitive sampling plans based on one-sided process capability indices | 2018-04-11 | Paper |
| Double moving average–EWMA control chart for exponentially distributed quality | 2018-03-13 | Paper |
| A new t-chart using process capability index | 2017-11-15 | Paper |
| Time-truncated attribute sampling plans using EWMA for Weibull and Burr type X distributions | 2017-10-27 | Paper |
| A mixed control chart using process capability index | 2017-09-27 | Paper |
| Designing of a control chart using belief statistic for exponential distribution | 2017-07-31 | Paper |
| Monitoring process mean using generally weighted moving average chart for exponentially distributed characteristics | 2017-07-31 | Paper |
| Design of sampling plan using auxiliary information | 2017-07-27 | Paper |
| Developing a variables two-plan sampling system for product acceptance determination | 2017-04-27 | Paper |
| Designing of two mixed variable lot-size sampling plans using repetitive sampling and resampling based on the process capability index | 2017-02-01 | Paper |
| Variable sampling inspection for resubmitted lots based on process capability index \(C_{pk}\) for normally distributed items | 2016-12-07 | Paper |
| Mixed sampling plan based on exponentially weighted moving average statistic | 2016-11-11 | Paper |
| A new system of skip-lot sampling plans including resampling | 2016-01-13 | Paper |
| Clustering noise-included data by controlling decision errors | 2014-09-26 | Paper |
| Variable repetitive group sampling plans with process loss consideration | 2013-06-28 | Paper |
| A two-stage group sampling plan based on truncated life tests for a general distribution | 2013-06-28 | Paper |
| Optimal designing of skip-lot sampling plan of type SkSP-2 with group acceptance sampling plan as reference plan under Burr-type XII distribution | 2013-06-03 | Paper |
| Optimal designing of skip-lot sampling plan of type SkSP-2 with group acceptance sampling plan as reference plan under Burr-type XII distribution | 2013-06-03 | Paper |
| Two-Stage Variables Acceptance Sampling Plans Using Process Loss Functions | 2012-11-12 | Paper |
| A Process Monitoring Scheme Controlling False Discovery Rate | 2012-10-30 | Paper |
| Variables sampling inspection scheme for resubmitted lots based on the process capability index \(C_{pk}\) | 2012-08-16 | Paper |
| Design of progressively censored group sampling plans for Weibull distributions: an optimization problem | 2012-05-14 | Paper |
| New acceptance sampling plans based on life tests for Birnbaum–Saunders distributions | 2011-07-29 | Paper |
| Stability-based validation of bicluster solutions | 2010-12-23 | Paper |
| A New Control Scheme Always Better Than X-Bar Chart | 2010-12-20 | Paper |
| Use of reference distributions when dealing with unknown regression errors | 2010-01-29 | Paper |
| Repetitive group sampling procedure for variables inspection | 2007-09-13 | Paper |
| Multiple dependent state sampling plans for lot acceptance based on measurement data | 2007-03-27 | Paper |
| Average outgoing quality of CSP-C continuous sampling plan under short run production processes | 2007-03-08 | Paper |
| System Reliability By Simulation: Random Hazards Versus Importance Sampling | 2007-01-19 | Paper |
| Heuristic Procedures for Simultaneous Estimation of Several Normal Means | 2007-01-19 | Paper |
| Analysis of a Discrete-Time Queueing System with a Markov-Modulated input Process and constant service Rate | 2006-08-30 | Paper |
| Performance evaluation of re-entrant manufacturing system with production loss using mean value analysis | 2006-06-30 | Paper |
| Designing of Variables Repetitive Group Sampling Plan Involving Minimum Average Sample Number | 2005-10-17 | Paper |
| Analysis of a discrete-time queueing system with a single server and heterogeneous Markovian arrivals | 2003-01-14 | Paper |
| Mean value analysis of re-entrant line with batch machines and multi-class jobs | 2002-10-24 | Paper |
| Use of contagious distributions in the semiconductor yield models considering cluster effect | 2001-02-27 | Paper |
| Simulating the average run length for cusum schemes using variance reduction techniques | 1994-01-19 | Paper |