Publication | Date of Publication | Type |
---|
Knot diagrams of treewidth two | 2022-12-21 | Paper |
Possible and Impossible Attempts to Solve the Treewidth Problem via ILPs | 2022-10-19 | Paper |
https://portal.mardi4nfdi.de/entity/Q5091522 | 2022-07-26 | Paper |
Dispersing Obnoxious Facilities on a Graph | 2022-07-18 | Paper |
Cyclic lot-sizing problems with sequencing costs | 2021-12-13 | Paper |
Vessel velocity decisions in inland waterway transportation under uncertainty | 2021-11-09 | Paper |
Dispersing obnoxious facilities on a graph | 2021-06-11 | Paper |
Inland waterway efficiency through skipper collaboration and joint speed optimization | 2021-06-07 | Paper |
On the status sequences of trees | 2021-01-19 | Paper |
https://portal.mardi4nfdi.de/entity/Q5111244 | 2020-05-26 | Paper |
Scheduling unit-length jobs with precedence constraints of small height | 2018-08-27 | Paper |
Complexity and approximability of the k‐way vertex cut | 2018-05-11 | Paper |
Location, Pricing and the Problem of Apollonius | 2018-02-13 | Paper |
An efficient algorithm for the single facility location problem with polyhedral norms and disk-shaped demand regions | 2018-02-01 | Paper |
Location, pricing and the problem of Apollonius | 2017-12-15 | Paper |
A PTAS for the Cluster Editing Problem on Planar Graphs | 2017-04-04 | Paper |
High Multiplicity Scheduling with Switching Costs for Few Products | 2016-05-19 | Paper |
A Note on the Minimum H-Subgraph Edge Deletion | 2015-09-29 | Paper |
On Low Treewidth Graphs and Supertrees | 2015-08-25 | Paper |
On time-optimal trajectories in non-uniform mediums | 2015-06-05 | Paper |
https://portal.mardi4nfdi.de/entity/Q5247216 | 2015-04-23 | Paper |
Bidimensionality of Geometric Intersection Graphs | 2015-01-13 | Paper |
https://portal.mardi4nfdi.de/entity/Q5403052 | 2014-03-25 | Paper |
On planar graphs with large tree-width and small grid minors | 2013-07-04 | Paper |
Dynamic pricing problems with elastic demand | 2012-08-17 | Paper |
The Valve Location Problem in Simple Network Topologies | 2012-07-28 | Paper |
A note on the integrality gap of an ILP formulation for the periodic maintenance problem | 2012-07-13 | Paper |
A note on planar graphs with large width parameters and small grid-minors | 2012-05-30 | Paper |
On the complexity of a bundle pricing problem | 2012-01-10 | Paper |
How to Cut a Graph into Many Pieces | 2011-07-01 | Paper |
Price strategy implementation | 2010-10-15 | Paper |
Algorithms for the Minimum Edge Cover of H-Subgraphs of a Graph | 2010-01-28 | Paper |
On the Complexity of the Highway Pricing Problem | 2010-01-28 | Paper |
Connected Feedback Vertex Set in Planar Graphs | 2010-01-21 | Paper |
Scheduling jobs with time-resource tradeoff via nonlinear programming | 2009-11-23 | Paper |
On the minimum corridor connection problem and other generalized geometric problems | 2009-08-14 | Paper |
Optimal pricing of capacitated networks | 2009-07-28 | Paper |
The Valve Location Problem in Simple Network Topologies | 2009-01-20 | Paper |
Optimal bundle pricing with monotonicity constraint | 2008-11-27 | Paper |
Bundle Pricing with Comparable Items | 2008-09-25 | Paper |
How to Sell a Graph: Guidelines for Graph Retailers | 2008-09-04 | Paper |
Treewidth lower bounds with brambles | 2008-05-27 | Paper |
On the Minimum Corridor Connection Problem and Other Generalized Geometric Problems | 2008-02-21 | Paper |
Pricing bridges to cross a river | 2008-01-18 | Paper |
Algorithms for graphs embeddable with few crossings per edge | 2007-11-28 | Paper |
Multiplicity and complexity issues in contemporary production scheduling | 2007-10-26 | Paper |
Unrelated Parallel Machine Scheduling with Resource Dependent Processing Times | 2007-08-30 | Paper |
LP Rounding and an Almost Harmonic Algorithm for Scheduling with Resource Dependent Processing Times | 2007-08-28 | Paper |
The geometric generalized minimum spanning tree problem with grid clustering | 2007-05-24 | Paper |
Machine scheduling with resource dependent processing times | 2007-04-19 | Paper |
Approximation and Online Algorithms | 2007-02-12 | Paper |
Fundamentals of Computation Theory | 2006-10-20 | Paper |
On the high multiplicity traveling salesman problem | 2006-06-30 | Paper |
Algorithms – ESA 2005 | 2006-06-27 | Paper |
Modeling and solving the periodic maintenance problem | 2006-05-16 | Paper |
Basic scheduling problems with raw material constraints | 2006-01-23 | Paper |
Approximation and Online Algorithms | 2005-12-14 | Paper |
A framework for the complexity of high-multiplicity scheduling problems | 2005-10-18 | Paper |
Quantum theory of neutrino spin-light in matter | 2005-10-17 | Paper |
SPIN LIGHT OF NEUTRINO IN GRAVITATIONAL FIELDS | 2005-06-07 | Paper |
Project scheduling with irregular costs: complexity, approximability, and algorithms | 2005-02-09 | Paper |
https://portal.mardi4nfdi.de/entity/Q4427859 | 2003-09-14 | Paper |