John A. Buzacott

From MaRDI portal
Person:439559

Available identifiers

zbMath Open buzacott.john-alanMaRDI QIDQ439559

List of research outcomes





PublicationDate of PublicationType
Capital allocation to alternatives with a multivariate ladder gamma return distribution2017-04-27Paper
Contract design for risk sharing partnerships in manufacturing2012-08-16Paper
Flexibility in manufacturing and services: achievements, insights and challenges2010-05-21Paper
Operations and Shipment Scheduling of a Batch on a Flexible Machine2009-07-09Paper
Analysis of a newsvendor which has errors in inventory data records2008-02-13Paper
https://portal.mardi4nfdi.de/entity/Q54853922006-08-30Paper
https://portal.mardi4nfdi.de/entity/Q54652542005-08-22Paper
https://portal.mardi4nfdi.de/entity/Q54652392005-08-22Paper
A robust policy for serial agile production systems2005-06-01Paper
Dynamic inventory targets revisited2005-01-13Paper
Modelling teams and workgroups in manufacturing2004-03-15Paper
Multiproduct Kanban-like Control Systems2004-01-04Paper
Flexibility analysis: A methodology and a case study2003-09-25Paper
Bounds on queues with delayed generalized exponential arrivals2002-12-15Paper
Optimal and near-optimal inventory control policies for a make-to-order inventory-production system2002-11-13Paper
Improved bounds for queues with delayed arrivals1999-10-25Paper
‘Common sense’ realities of planning and scheduling in printed circuit board production1998-12-03Paper
A two-stage tandem queue attended by a moving server with holding and switching costs1998-04-13Paper
Commonalities in Reengineered Business Processes: Models and Issues1997-12-15Paper
Safety Stock versus Safety Time in MRP Controlled Production Systems1995-07-13Paper
Approximate mean value performance analysis of cyclic queueing networks with production blocking1994-05-18Paper
A decomposition-related throughput property of tandem queueing networks with blocking1993-08-22Paper
Design of manufacturing systems using queueing models1993-04-01Paper
The reversibility of cyclic queues1993-01-16Paper
Flow time distributions in a \(K\) class \(M/G/1\) priority feedback queue1992-06-25Paper
A production system with two job classes, changeover times and revisitation1992-06-25Paper
Approximate models of assembly systems with finite inventory banks1990-01-01Paper
Flexibility and decision making1990-01-01Paper
Impact of flexible machines on automated manufacturing systems1988-01-01Paper
Capacity expansion with interrupted demand growth1988-01-01Paper
Improved Bounds for System-Failure Probability1987-01-01Paper
Modeling a Class of Flexible Manufacturing Systems with Reversible Routing1987-01-01Paper
An Algorithm for Symbolic Reliability Computation with Path-sets or Cut-sets1987-01-01Paper
Node partition formula for directed graph reliability1987-01-01Paper
Models of flexible manufacturing systems with limited local buffers1986-01-01Paper
On queueing network models of flexible manufacturing systems1986-01-01Paper
The exponentialization approach to flexible manufacturing system models with general processing times1986-01-01Paper
Equipment reliability and maintenance1985-01-01Paper
Queueing models for a flexible machining station. I: The diffusion approximation1985-01-01Paper
Queueing models for a flexible machining station. II: The method of Coxian phases1985-01-01Paper
Modelling the performance of flexible manufacturing systems1985-01-01Paper
The time spent in a dynamic job shop1984-01-01Paper
Cut-Set Intersections and Node Partitions1984-01-01Paper
Probability of Component or Subsystem Failure Before System Failure1983-01-01Paper
One- and two-stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rate1983-01-01Paper
The Ordering of Terms in Cut-based Recursive Disjoint Products1983-01-01Paper
ON THE USE OF DECOMPOSITION APPROACHES IN A SINGLE MACHINE SCHDULING PROBLEM1982-01-01Paper
A recursive algorithm for finding reliability measures related to the connection of nodes in a graph1981-01-01Paper
The Effect Of Queue Discipline On The Capacity Of Oueues With Service Time Dependent On Waiting Times1974-01-01Paper
Sequencing many jobs on a multi-purpose facility1971-01-01Paper
https://portal.mardi4nfdi.de/entity/Q56848201971-01-01Paper

Research outcomes over time

This page was built for person: John A. Buzacott