| Publication | Date of Publication | Type |
|---|
| Optimizing emergency supply pre-positioning for disaster relief: a two-stage distributionally robust approach | 2024-07-08 | Paper |
| A 3/2-approximation algorithm for the multiple Hamiltonian path problem with no prefixed endpoints | 2024-06-17 | Paper |
| A signomial programming-based approach for multi-echelon supply chain disruption risk assessment with robust dynamic Bayesian network | 2023-11-15 | Paper |
| An integrated approach for a new flexible multi-product disassembly line balancing problem | 2022-09-27 | Paper |
| Unrelated parallel machine scheduling problem with special controllable processing times and setups | 2022-09-27 | Paper |
| A bi-objective decision model and method for the integrated optimization of bus line planning and Lane reservation | 2022-07-18 | Paper |
| Novel distribution-free model and method for stochastic disassembly line balancing with limited distributional information | 2022-07-18 | Paper |
| Scheduling with divisible jobs and subcontracting option | 2022-06-22 | Paper |
| A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions | 2021-06-04 | Paper |
| A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times | 2021-05-05 | Paper |
| Two-stage matching-and-scheduling algorithm for real-time private parking-sharing programs | 2021-04-20 | Paper |
| Identical parallel machine scheduling with assurance of maximum waiting time for an emergency job | 2020-06-04 | Paper |
| Liner ship bunkering and sailing speed planning with uncertain demand | 2020-02-28 | Paper |
| A combined average-case and worst-case analysis for an integrated hub location and revenue management problem | 2020-02-18 | Paper |
| Coke production scheduling problem: a parallel machine scheduling with batch preprocessings and location-dependent processing times | 2019-02-14 | Paper |
| An effective hybrid approach to the two-stage capacitated facility location problem | 2019-01-28 | Paper |
| An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing | 2018-10-30 | Paper |
| Single machine scheduling with resource allocation and learning effect considering the rate-modifying activity | 2018-08-30 | Paper |
| Single-machine past-sequence-dependent setup times scheduling with resource allocation and learning effect | 2017-01-12 | Paper |
| Bi-objective optimization of single-machine batch scheduling under time-of-use electricity prices | 2017-01-12 | Paper |
| An effective GRASP and tabu search for the 0-1 quadratic knapsack problem | 2017-01-05 | Paper |
| Some complexity results and an efficient algorithm for quay crane scheduling problem | 2016-12-14 | Paper |
| Lower and upper bounds for a two-stage capacitated facility location problem with handling costs | 2015-02-03 | Paper |
| A cut-and-solve based algorithm for the single-source capacitated facility location problem | 2012-12-29 | Paper |
| Large scale stochastic inventory routing problems with~split delivery and service level constraints | 2012-11-15 | Paper |
| Competitive facility location and design with reactions of competitors already in the market | 2012-08-16 | Paper |
| Due-window assignment and scheduling with multiple rate-modifying activities under the effects of deterioration and learning | 2011-06-07 | Paper |
| A solution approach to the inventory routing problem in a three-level distribution system | 2011-06-07 | Paper |
| Performance evaluation of distribution strategies for the inventory routing problem | 2009-11-23 | Paper |
| Lower and upper bounds for a capacitated plant location problem with multicommodity flow | 2009-06-18 | Paper |
| A Stackelberg game and its improvement in a VMI system with a manufacturing vendor | 2009-04-08 | Paper |
| A new model and hybrid approach for large scale inventory routing problems | 2008-04-24 | Paper |
| A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness | 2007-02-13 | Paper |
| A note on ``Coordination of production and distribution planning by P. Chandra and M. L. Fisher | 2006-12-07 | Paper |
| A scatter search for the periodic capacitated arc routing problem | 2005-10-26 | Paper |
| An Improved Adaptive Algorithm for Competitive Group Testing | N/A | Paper |