John J. Liu

From MaRDI portal
Person:707107

Available identifiers

zbMath Open liu.john-jMaRDI QIDQ707107

List of research outcomes





PublicationDate of PublicationType
Learning-based Traffic State Reconstruction using Probe Vehicles2020-11-10Paper
Characteristics of semi-convex frontier optimization2016-03-08Paper
A strong convergence theorem for relatively nonexpansive mappings and equilibrium problems in Banach spaces2012-12-18Paper
Band Control of Mutual Proportional Reinsurance2011-12-19Paper
Valuation of information-sharing in marine mutual insurance2011-08-16Paper
QVI characterization of contingent options in marine mutual insurance2011-08-16Paper
Group and individual heterogeneity in a stochastic frontier model: container terminal operators2011-08-10Paper
Singular control and impulse control: a common approach2010-01-19Paper
Intertemporal service pricing with strategic customers2009-12-07Paper
Threshold control of mutual insurance with limited commitment2008-08-18Paper
Pricing policies under direct vs. indirect channel competition and national vs. store brand competition2007-02-26Paper
Optimal promotion planning -- depth and frequency -- for a two-stage supply chain under Markov switching demand2006-12-07Paper
Modeling the role of retail price formats, and retailer competition types on production schedule strategy2005-02-09Paper
Operational capacity allocation for unreliable module-based assembly systems.2004-03-14Paper
Channel redistribution with direct selling2003-04-10Paper
Strategic options in re-engineering of a manufacturing system with uncertain completion time1999-11-25Paper
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs1999-11-10Paper
Weighted Tardiness Single Machine Scheduling with Proportional Weights1994-03-17Paper
Multi-period production control in a centralized fully flexible manufacturing system1993-01-16Paper
Optimal Dispatching in a Periodic Review Cellular Manufacturing System1990-01-01Paper
An approximate solution of the flow-shop problem with sequence dependent setup times1989-01-01Paper
The Single Machine Problem with a Quadratic Cost Function of Completion Times1988-01-01Paper

Research outcomes over time

This page was built for person: John J. Liu