| Publication | Date of Publication | Type |
|---|
| Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process | 2024-08-15 | Paper |
| A dynamic dispatching problem to allocate relief vehicles after a disaster | 2023-10-10 | Paper |
| An accelerated benders decomposition algorithm for stochastic power system expansion planning using sample average approximation | 2023-06-26 | Paper |
| Solving an integrated cell formation and group layout problem using a simulated annealing enhanced by linear programming | 2022-07-18 | Paper |
| Minimal covering unrestricted location of obnoxious facilities: bi-objective formulation and a case study | 2022-03-25 | Paper |
| An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart | 2022-03-23 | Paper |
| Extraction and organization of statistical distribution functions for simulation of variations and patterns in the variability control charts | 2022-03-23 | Paper |
| Multi-objective multi-factory scheduling | 2021-07-27 | Paper |
| Stochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristics | 2020-01-08 | Paper |
| Application of the preventive maintenance scheduling to increase the equipment reliability: case study- bag filters in cement factory | 2019-11-21 | Paper |
| A game-theoretic model to analyze value creation with simultaneous cooperation and competition of supply chain partners | 2019-02-08 | Paper |
| Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates | 2018-12-07 | Paper |
| Order acceptance and due-date quotation in low machine rates | 2018-12-07 | Paper |
| Pricing and inventory control in a supply chain of deteriorating items: a non-cooperative strategy with probabilistic parameters | 2018-10-11 | Paper |
| Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions | 2018-02-16 | Paper |
| A study on open shop scheduling to minimise total tardiness | 2017-03-01 | Paper |
| Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach | 2016-12-02 | Paper |
| Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times | 2016-11-14 | Paper |
| Pricing and lot-sizing decisions in retail industry: a fuzzy chance constraint approach | 2016-03-16 | Paper |
| Acceleration strategies of Benders decomposition for the security constraints power system expansion planning | 2016-03-09 | Paper |
| A hybrid credibility-based fuzzy multiple objective optimisation to differential pricing and inventory policies with arbitrage consideration | 2016-03-08 | Paper |
| Applying FARSJUM intelligent system to derive priorities in sparse hierarchical problems | 2015-11-16 | Paper |
| Fuzzy hypothesis testing with vague data using likelihood ratio test | 2015-11-09 | Paper |
| A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem | 2015-09-09 | Paper |
| Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs | 2015-02-25 | Paper |
| Fuzzy development of Mean and Range control charts using statistical properties of different representative values | 2015-01-16 | Paper |
| The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine | 2014-08-01 | Paper |
| Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness | 2014-05-14 | Paper |
| A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes | 2014-04-16 | Paper |
| Two-machine flow shop total tardiness scheduling problem with deteriorating jobs | 2013-01-13 | Paper |
| Realistic two-stage flowshop batch scheduling problems with transportation capacity and times | 2012-04-21 | Paper |
| A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain | 2012-02-21 | Paper |
| Bi-criteria assembly line balancing by considering flexible operation times | 2011-12-18 | Paper |
| Hybrid flowshop scheduling with machine and resource-dependent processing times | 2011-05-10 | Paper |
| Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost | 2011-03-16 | Paper |
| Scheduling open shops with parallel machines to minimize total completion time | 2010-11-30 | Paper |
| Scheduling job shop problems with sequence-dependent setup times | 2010-11-07 | Paper |
| Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times | 2010-10-26 | Paper |
| A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling | 2010-10-25 | Paper |
| A contribution and new heuristics for open shop scheduling | 2009-10-16 | Paper |
| Group shops scheduling with makespan criterion subject to random release dates and processing times | 2009-10-16 | Paper |
| A note on minimizing makespan on a single batch processing machine with nonidentical job sizes | 2009-07-10 | Paper |
| An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages | 2009-03-10 | Paper |
| Lower bound for the mean project completion time in dynamic PERT networks | 2007-11-23 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5422204 | 2007-10-26 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5422209 | 2007-10-26 | Paper |
| Earliness tardiness production planning and scheduling in flexible flowshop systems under finite planning horizon | 2007-05-14 | Paper |
| Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines | 2007-04-26 | Paper |
| Developing a heuristic algorithm for order production planning using network models under uncertainty conditions | 2007-01-11 | Paper |
| An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times | 2006-11-15 | Paper |
| A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept | 2006-11-15 | Paper |
| A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains | 2006-05-29 | Paper |
| A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over | 2006-04-11 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5719071 | 2006-01-16 | Paper |
| Optimal control of service rates and arrivals in Jackson networks | 2003-04-10 | Paper |
| A new structural mechanism for reducibility of stochastic PERT networks | 2003-04-10 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3149926 | 2003-03-04 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3149928 | 2003-02-25 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3149922 | 2002-11-24 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3149924 | 2002-11-24 | Paper |
| Path critical index and activity critical index in PERT networks | 2002-11-13 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3149923 | 2002-11-11 | Paper |
| A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network | 2000-04-09 | Paper |