Rongjun Chen

From MaRDI portal
Person:779069

Available identifiers

zbMath Open chen.rongjunMaRDI QIDQ779069

List of research outcomes





PublicationDate of PublicationType
https://portal.mardi4nfdi.de/entity/Q58732632023-02-09Paper
Wireless wearable biosensor smart physiological monitoring system for risk avoidance and rescue2022-04-25Paper
Dynamical behavior and optimal capture strategy of three-species predator-prey system2021-04-26Paper
Two-machine flow shop scheduling with limited cost of outsourcing2020-08-12Paper
Upper bound on the bit error probability of systematic binary linear codes via their weight spectra2020-07-21Paper
Scheduling with outsourcing on single machine2018-05-25Paper
Uniform-machine scheduling with outsourcing option2018-05-25Paper
Open-shop scheduling with option of outsourcing2017-10-20Paper
Cooperative scheduling between two single machines2016-10-06Paper
Bicriteria scheduling on single machine with outsourcing2016-08-10Paper
Scheduling with outsourcing and variable time slot costs2016-08-10Paper
Output feedback adaptive neural control without seeking SPR condition2016-03-17Paper
Two-machine open-shop scheduling with outsourcing2015-06-29Paper
The duality of jobs and machines in scheduling2014-06-30Paper
Open-shop dense schedules: properties and worst-case performance ratio2014-02-05Paper
Scheduling and subcontracting under parallel machines2013-11-19Paper
Supply chain scheduling with subcontracting options under uniform machines2013-06-20Paper
A revised proof of the optimality for the Kise-Ibaraki-Mine algorithm2012-12-28Paper
Supply chain scheduling in assembly systems2012-10-05Paper
Approximation algorithms of logistics scheduling under parallel machines2012-10-05Paper
Supply chain scheduling with open-shop problem2012-06-01Paper
Existence and uniqueness of solutions for periodically perturbed conservative systems2012-06-01Paper
https://portal.mardi4nfdi.de/entity/Q31095132012-01-27Paper
A kind of logistic scheduling under open shop machines2012-01-27Paper
Open shop problem to minimize the total weighted completion time2011-07-19Paper
Dense schedule for open shop problems with two idle intervals at most on the last complete machine2011-07-19Paper
https://portal.mardi4nfdi.de/entity/Q30715222011-02-05Paper
Supply chain scheduling with parallel machines2011-02-05Paper
Supply chain scheduling with open-shop problem2010-11-05Paper
Study of properties of dense schedules for open-shop2010-07-08Paper
BICRITERIA SCHEDULING ON SINGLE-MACHINE WITH INVENTORY OPERATIONS2009-09-22Paper
Scheduling Problems in Cross Docking2009-07-07Paper
Bicriteria Scheduling on Single-Machine with Inventory Operations2009-07-07Paper
Dense open-shop schedules with release times2008-11-18Paper
The further study of dense schedule performance ratio for three-machine open-shop problems with job release times2008-04-04Paper

Research outcomes over time

This page was built for person: Rongjun Chen