Małgorzata Sterna

From MaRDI portal
(Redirected from Person:827601)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Exact approaches to late work scheduling on unrelated machines
International Journal of Applied Mathematics and Computer Science
2023-09-07Paper
Two-machine flow-shop scheduling to minimize total late work: revisited
Engineering Optimization
2022-12-23Paper
Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work
Engineering Optimization
2022-12-23Paper
Two-machine flow shop scheduling with a common due date to maximize total early work
European Journal of Operational Research
2022-03-18Paper
Mirror scheduling problems with early work and late work criteria
Journal of Scheduling
2022-01-14Paper
Semi-online scheduling on two identical machines with a common due date to maximize total early work
Discrete Applied Mathematics
2021-01-13Paper
Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date
European Journal of Operational Research
2020-02-25Paper
Scheduling on parallel identical machines with late work criterion: offline and online cases
Journal of Scheduling
2018-02-28Paper
Polynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early work
Journal of Optimization Theory and Applications
2017-10-27Paper
Complexity of scheduling problem in single-machine flexible manufacturing system with cyclic transportation and unlimited buffers
Journal of Optimization Theory and Applications
2017-10-27Paper
Revenue maximization on parallel machines
Operations Research Proceedings 2008
2011-04-07Paper
Dominance relations for two-machine flow shop problem with late work criterion
Bulletin of the Polish Academy of Sciences. Technical Sciences
2011-01-19Paper
Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date
Computers & Operations Research
2007-10-10Paper
A note on the two machine job shop with the weighted late work criterion
Journal of Scheduling
2007-05-15Paper
KI 2005: Advances in Artificial Intelligence
Lecture Notes in Computer Science
2006-11-13Paper
The two-machine flow-shop problem with weighted late work criterion and common due date
European Journal of Operational Research
2005-04-21Paper
Open shop scheduling problems with late work criteria.
Discrete Applied Mathematics
2004-01-26Paper
scientific article; zbMATH DE number 1859342 (Why is no real title available?)2003-04-23Paper
The disjunctive graph machine representation of the job shop scheduling problem
European Journal of Operational Research
2002-08-19Paper
scientific article; zbMATH DE number 1594554 (Why is no real title available?)2001-05-06Paper
A note on disjunctive graph representation
Bulletin of the Polish Academy of Sciences. Technical Sciences
2000-04-10Paper


Research outcomes over time


This page was built for person: Małgorzata Sterna