Chi To Ng

From MaRDI portal
(Redirected from Person:850245)
Chi To Ng Q850245



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Unbounded parallel-batch scheduling to minimize the total weighted tardy span
Journal of Industrial and Management Optimization
2026-02-26Paper
Even cycles and perfect matchings in planar graphs
Discrete Applied Mathematics
2025-11-04Paper
Bicriterion parallel-machine scheduling of equal-length jobs to minimize total tardiness and number of tardy jobs
Journal of Combinatorial Optimization
2025-10-22Paper
Single-machine scheduling with positional deadlines, time deadlines, and due date assignment for minimizing total weighted tardiness
Naval Research Logistics
2025-10-10Paper
Sufficient conditions for k-factors and spanning trees of graphs
Discrete Applied Mathematics
2025-06-19Paper
Properly colored even cycles in edge-colored complete balanced bipartite graphs
Discrete Mathematics
2025-06-12Paper
Single-machine preemptive scheduling with assignable due dates or assignable weights to minimize total weighted late work
European Journal of Operational Research
2025-05-19Paper
Claw-free minimal matching covered graphs
Discrete Applied Mathematics
2025-04-28Paper
Competition under demand uncertainty: the roles of technology and capacity strategy
European Journal of Operational Research
2024-07-16Paper
Operations strategy for a construction supply chain: modular integrated construction and blockchain adoption
International Transactions in Operational Research
2024-06-25Paper
Approximation algorithms for batch scheduling with processing set restrictions
Journal of Scheduling
2024-04-02Paper
Properly colored cycles in edge-colored 2-colored-triangle-free complete graphs
Discrete Applied Mathematics
2024-01-09Paper
Information sharing and coordination in a vaccine supply chain
Annals of Operations Research
2023-11-16Paper
Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work
Naval Research Logistics
2023-10-25Paper
Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work
Naval Research Logistics
2023-10-18Paper
Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work
Naval Research Logistics
2023-10-17Paper
Properly colored even cycles in edge-colored complete balanced bipartite graphs2023-10-07Paper
Sufficient conditions for $k$-factors and spanning trees of graphs2023-08-26Paper
An alternative approach for proving the NP-hardness of optimization problems
European Journal of Operational Research
2016-10-07Paper
A note on reverse scheduling with maximum lateness objective
Journal of Scheduling
2014-08-18Paper
Polynomial-time approximation scheme for concurrent open shop scheduling with a fixed number of machines to minimize the total weighted completion time
Naval Research Logistics
2012-06-18Paper
An improved on-line algorithm for single parallel-batch machine scheduling with delivery times
Discrete Applied Mathematics
2012-05-30Paper
Two-agent scheduling to minimize the total cost
European Journal of Operational Research
2012-05-14Paper
Batch scheduling of deteriorating products
Decision Making in Manufacturing and Services
2011-06-28Paper
Minimizing total completion time in a two-machine flow shop with deteriorating jobs
Applied Mathematics and Computation
2006-11-15Paper
Batch scheduling with controllable setup and processing times to minimize total completion time
The Journal of the Operational Research Society
2005-06-21Paper
Single machine batch scheduling with jointly compressible setup and processing times.
European Journal of Operational Research
2004-01-05Paper


Research outcomes over time


This page was built for person: Chi To Ng