Fawaz S. Al-Anzi

From MaRDI portal
(Redirected from Person:858766)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Modeling Arabic language diacritized names Markovian chains2009-09-29Paper
The two-stage assembly scheduling problem to minimize total completion time with setup times
Computers & Operations Research
2009-05-19Paper
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
Computers & Operations Research
2009-04-03Paper
A hybrid tabu search heuristic for the two-stage assembly scheduling problem2008-01-28Paper
Batching deteriorating items with applications in computer communication and reverse logistics
European Journal of Operational Research
2007-06-13Paper
scientific article; zbMATH DE number 5151911 (Why is no real title available?)2007-05-11Paper
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
European Journal of Operational Research
2007-05-11Paper
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm
International Journal of Production Research
2007-03-21Paper
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
International Journal of Production Research
2007-03-21Paper
Using mixed graph coloring to minimize total completion time in job shop scheduling
Applied Mathematics and Computation
2007-01-11Paper
Scheduling multi-stage parallel-processor services to minimize average response time
The Journal of the Operational Research Society
2006-02-13Paper
Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests
JMMA. Journal of Mathematical Modelling and Algorithms
2006-01-17Paper
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times
European Journal of Operational Research
2005-11-04Paper
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
Computers & Operations Research
2005-11-01Paper
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
Computers & Operations Research
2002-05-14Paper


Research outcomes over time


This page was built for person: Fawaz S. Al-Anzi