| Publication | Date of Publication | Type |
|---|
| On the distribution-free newsboy problem with some non-skewed demands | 2018-10-01 | Paper |
| Corrigendum to: ``The distribution-free newsboy problem under the worst-case and best-case scenarios | 2016-07-06 | Paper |
| The distribution-free newsboy problem and the demand skew | 2016-05-18 | Paper |
| The distribution-free newsboy problem under the worst-case and best-case scenarios | 2015-02-04 | Paper |
| An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times | 2012-11-15 | Paper |
| On recent modifications and extensions of the NEH heuristic for flow shop sequencing | 2011-05-10 | Paper |
| An empirical analysis of the optimality rate of flow shop heuristics | 2009-06-30 | Paper |
| An improved NEH heuristic to minimize makespan in permutation flow shops | 2008-03-11 | Paper |
| Two-machine stochastic flow shops with blocking and the traveling salesman problem | 2007-05-15 | Paper |
| On no-wait and no-idle flow shops with makespan criterion | 2007-01-16 | Paper |
| A heuristic for minimizing the expected makespan in two-machine flow shops with consistent coefficients of variation | 2005-11-04 | Paper |
| Generalization of Johnson's and Talwar's scheduling rules in two-machine stochastic flow shops | 2005-05-23 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4509382 | 2001-10-07 | Paper |
| Non-bottleneck machines in three-machine flow shops | 2001-01-03 | Paper |
| On three-machine flow shops with random job processing times | 2000-09-14 | Paper |
| Stochastically minimizing the makespan in two-machine flow shops without blocking | 2000-06-29 | Paper |
| On the minimum dummy-arc problem | 1993-08-29 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4030448 | 1993-04-01 | Paper |
| Optimal Reduction of Two-Terminal Directed Acyclic Graphs | 1993-03-09 | Paper |
| Bounding the distribution of project duration in PERT networks | 1993-01-16 | Paper |
| The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs) | 1993-01-12 | Paper |
| Minimum flows in (s,t) planar networks | 1992-06-27 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3197607 | 1990-01-01 | Paper |
| Bounds on the mean of the maximum of a number of normal random variables | 1989-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3792464 | 1987-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4726020 | 1986-01-01 | Paper |
| A Note on Bounds for the Moments of a Stochastic Project Planniag Model Duration | 1986-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3741395 | 1986-01-01 | Paper |
| An upper bound on the expected completion time of PERT networks | 1985-01-01 | Paper |
| Normally Distributed Activity Durations in PERT Networks | 1985-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3731391 | 1985-01-01 | Paper |
| Technical Note—A Note on the Stochastic Shortest Route Problem | 1985-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3727727 | 1985-01-01 | Paper |
| Two-point approximations for activity times in PERT networks | 1985-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3691403 | 1985-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3683884 | 1984-01-01 | Paper |
| Some remarks on the expected delay of project duration in a PERT network | 1984-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3323685 | 1984-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3690569 | 1984-01-01 | Paper |
| The use of fuzzy variables in PERT | 1981-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3892053 | 1979-01-01 | Paper |