| Publication | Date of Publication | Type |
|---|
| https://portal.mardi4nfdi.de/entity/Q5083178 | 2022-06-22 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5083187 | 2022-06-22 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5083188 | 2022-06-22 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5083203 | 2022-06-22 | Paper |
| Convergence rate analysis of an iterative algorithm for solving the multiple-sets split equality problem | 2022-01-19 | Paper |
| SINGLE MACHINE FAMILY SCHEDULING WITH TWO COMPETING AGENTS TO MINIMIZE MAKESPAN | 2012-02-19 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3572619 | 2010-07-08 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3572590 | 2010-07-08 | Paper |
| Scheduling deteriorating jobs with rejection on dominant machines | 2009-11-11 | Paper |
| A dynamic programming algorithm for scheduling problems on earliness award and tardiness penalty with time-dependent processing time | 2009-07-22 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5322780 | 2009-07-22 | Paper |
| Sensitivity analysis for some scheduling problems | 2008-11-24 | Paper |
| Scheduling linear deteriorating jobs with rejection on a single machine | 2008-11-20 | Paper |
| A multiple-criterion model for machine scheduling with constant deteriorating jobs | 2008-08-06 | Paper |
| A heuristic MBLS algorithm for the two semi-online parallel machine scheduling problems with deterioration jobs | 2008-04-04 | Paper |
| Fabrication scheduling on a single machine to minimize the weighted sum of product completion time | 2008-01-14 | Paper |
| A hybrid two-stage flexible flowshop scheduling problem with m identical parallel machines and a burn-in processor separately | 2008-01-14 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5427338 | 2007-11-20 | Paper |
| Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines | 2007-06-25 | Paper |
| A note on flow shop scheduling problems with a learning effect on no-idle dominant machines | 2007-05-14 | Paper |
| A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM | 2007-03-21 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3422541 | 2007-02-13 | Paper |
| Semi on-line scheduling problem for maximizing the minimum machine completion time on two uniform machines | 2007-01-25 | Paper |
| The single-machine scheduling problems with deteriorating jobs and learning effect | 2006-10-09 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5469816 | 2006-05-26 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3366837 | 2006-02-16 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3366838 | 2006-02-16 | Paper |
| SEMI-ON-LINE SCHEDULING PROBLEM FOR MAXIMIZING THE MINIMUM MACHINE COMPLETION TIME ON THREE SPECIAL UNIFORM MACHINES | 2005-09-12 | Paper |
| Two scheduling problems in group technology with deteriorating jobs | 2005-07-27 | Paper |
| The lot-streaming problem in a flow shop with time adjustment | 2002-02-05 | Paper |
| A fast algorithm for the maximum lateness problem in single machine scheduling with batching | 2002-02-05 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4761372 | 2001-06-21 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4391862 | 1999-03-18 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4349530 | 1997-11-11 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4349521 | 1997-08-24 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4349537 | 1997-08-24 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5690730 | 1997-01-07 | Paper |
| An Application of the Bin-packing Technique to Job Scheduling on Uniform Processors | 1992-06-25 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3778554 | 1987-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3819916 | 1987-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3779681 | 1985-01-01 | Paper |