S. C. Malik

From MaRDI portal
(Redirected from Person:972970)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Stochastic analysis of an operating system with two types of inspection subject to degradation
Journal of Applied Probability and Statistics
2026-01-16Paper
Stochastic analysis of a non-identical repairable system with \((n+1)\) units subject to MRT of type-I unit
International Journal of Operational Research
2025-12-16Paper
Markov approach for reliability-availability-maintainability analysis of a three unit repairable system
Opsearch
2024-03-11Paper
An integrated DEMATEL six sigma hybrid framework for manufacturing process improvement
Annals of Operations Research
2023-06-26Paper
Regression modelling on reliability variation of a parallel series system of \((m, n_i)\) order with addition and removal of parallel paths
Journal of Statistical Theory and Practice
2021-11-09Paper
Quality improvement in manufacturing process through six sigma: a case study of Indian MSME firm
Yugoslav Journal of Operations Research
2021-05-05Paper
On soft and fuzzy soft relations with their applications2021-02-01Paper
Stochastic modeling of a repairable system under different weather conditions
Recent Advances in Mathematics, Statistics and Computer Science
2016-09-15Paper
Reliability measures of a parallel-unit system with arbitrary distributions of random variables
Recent Advances in Mathematics, Statistics and Computer Science
2016-09-15Paper
Reliability modeling of a computer system with priority to PM over h/w replacement subject to MOT and MRT
Journal of Rajasthan Academy of Physical Sciences
2013-10-07Paper
scientific article; zbMATH DE number 6194030 (Why is no real title available?)2013-08-01Paper
Cost-benefit analysis of a computer system with priority to S/W replacement over H/W repair2013-05-07Paper
scientific article; zbMATH DE number 6124452 (Why is no real title available?)2013-01-11Paper
scientific article; zbMATH DE number 6124411 (Why is no real title available?)2013-01-11Paper
scientific article; zbMATH DE number 6124427 (Why is no real title available?)2013-01-11Paper
Stochastic modeling and performance analysis of a \(2(k)\)-out-of-\(3(n)\) system with inspection subject to operational restriction
Journal of Reliability and Statistical Studies
2012-09-30Paper
Probabilistic analysis of a system of two non-identical parallel units with priority to repair subject to inspection
Journal of Reliability and Statistical Studies
2012-09-30Paper
Probabilistic analysis of a system with server failure during repair
Journal of Reliability and Statistical Studies
2012-09-30Paper
Stochastic modeling of a system with priority for operation to new unit and preventive maintenance at PFS subject to MOT
Journal of Reliability and Statistical Studies
2012-09-30Paper
Cost-benefit analysis of a two-unit parallel system subject to degradation after repair2011-06-24Paper
scientific article; zbMATH DE number 5847371 (Why is no real title available?)2011-02-05Paper
Reliability and economic analysis of a system operating under different weather conditions
Proceedings of the National Academy of Sciences, India. Section A. Physical Sciences
2010-05-27Paper
scientific article; zbMATH DE number 3904880 (Why is no real title available?)1984-01-01Paper
scientific article; zbMATH DE number 4056217 (Why is no real title available?)1984-01-01Paper
scientific article; zbMATH DE number 3809879 (Why is no real title available?)1982-01-01Paper
scientific article; zbMATH DE number 3181918 (Why is no real title available?)1960-01-01Paper


Research outcomes over time


This page was built for person: S. C. Malik