Phase-I design structure of Bayesian variance chart
From MaRDI portal
Recommendations
- Phase-I Design Scheme for -chart Based on Posterior Distribution
- Phase I and phase II-control charts for the variance and generalized variance
- Control Charts for the Generalized Variance Based on Its Predictive Distribution
- Shewhart-type control charts for variation in phase I data analysis
- Control Charts for the Mean and Variance based on Changepoint Methodology
Cites work
- Bayesian analysis of random-effect models in the analysis of variance. I. Posterior distribution of variance-components
- Bayesian Results for the Inverse Gaussian Distribution with an Application
- Control Charts for the Generalized Variance Based on Its Predictive Distribution
- Control charts for the variance and coefficient of variation based on their predictive distribution
- scientific article; zbMATH DE number 3426675 (Why is no real title available?)
- scientific article; zbMATH DE number 3513162 (Why is no real title available?)
- Inference about Variance Components in the One-Way Model
- ON THE EVALUATION OF CONTROL CHART LIMITS BASED ON PREDICTIVE DISTRIBUTIONS
- Phase-I Design Scheme for -chart Based on Posterior Distribution
- Prediction Limits for the Inverse Gaussian Distribution
- Prior distributions for variance parameters in hierarchical models (Comment on article by Browne and Draper)
- Sampling and Bayes' Inference in Scientific Modelling and Robustness
- Sampling-Based Approaches to Calculating Marginal Densities
Cited in
(3)
This page was built for publication: Phase-I design structure of Bayesian variance chart
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4966757)