Preemptive hybrid flowshop scheduling problem of interval orders
From MaRDI portal
Recommendations
Cites work
- A computational study of heuristics for two-stage flexible flowshops
- A multi-stage parallel-processor flowshop problem with minimum flowtime
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- Branch and bound algorithm for the flow shop with multiple processors
- Global lower bounds for flow shops with multiple processors
- scientific article; zbMATH DE number 3908482 (Why is no real title available?)
- Lower bounds for the head-body-tail problem on parallel machines: a computational study of the multiprocessor flow shop
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
- Scheduling preemptive jobs with precedence constraints on parallel machines
- Scheduling with deadlines and loss functions
- Testing for the consecutive ones property, interval graphs, and graph planarity using PQ-tree algorithms
- Two-Stage, Hybrid Flowshop Scheduling Problem
Cited in
(11)- Processor-shared service systems with queue-dependent processors
- The hybrid flow shop scheduling problem
- Scheduling jobs on a \(k\)-stage flexible flow-shop
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- scientific article; zbMATH DE number 7233676 (Why is no real title available?)
- scientific article; zbMATH DE number 4199943 (Why is no real title available?)
- Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem
- Preemptive Scheduling of Hybrid Parallel Machines
- A heuristic approach for scheduling advanced air mobility aircraft at vertiports
- The method of grey related analysis to multiple attribute decision making problems with interval numbers
- A taxonomy of flexible flow line scheduling procedures
This page was built for publication: Preemptive hybrid flowshop scheduling problem of interval orders
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5956203)