Optimal scheduling of continuous production with constrained schedule structure
From MaRDI portal
Publication:1002863
Recommendations
- An optimal control model for continuous time production and setup scheduling
- Optimization based scheduling for a class of production systems with integral constraints
- Necessary optimality conditions for a generalized problem of production scheduling
- Generalized scheduling problem for discrete manufacture. I
- scientific article; zbMATH DE number 1300079
Cited in
(17)- Optimal sizing, scheduling and shift policy of the grinding section of a ceramic tile plant
- scientific article; zbMATH DE number 2106810 (Why is no real title available?)
- Optimal scheduling of products with common and unique components
- Optimization based scheduling for a class of production systems with integral constraints
- Equipment selection models for oil mixing systems
- Automatic generation of production scheduling models in single stage multi-product batch plants: some examples
- Necessary optimality conditions for a generalized problem of production scheduling
- Production logistics scheduling method and its application for process industries based on node-flow control
- Generalized scheduling problem for discrete manufacture. I
- The generalized scheduling problem for discrete production. II
- Optimization of production planning problem with continuously distributed time-lags
- An operational scheduling algorithm for small-lot production
- Continuous nonlinear programming techniques to solve scheduling problems
- An effective formulation for optimal scheduling of multistage multi-product batch plant based on due dates
- scientific article; zbMATH DE number 5049922 (Why is no real title available?)
- scientific article; zbMATH DE number 3887406 (Why is no real title available?)
- Discrete and continuous time representations and mathematical models for large production scheduling problems: a case study from the pharmaceutical industry
This page was built for publication: Optimal scheduling of continuous production with constrained schedule structure
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1002863)