A GA optimization model for workgroup-based repetitive scheduling (WoRSM)
From MaRDI portal
Publication:1005604
DOI10.1016/J.ADVENGSOFT.2008.01.010zbMATH Open1155.90385OpenAlexW2042339220MaRDI QIDQ1005604FDOQ1005604
Authors: Rong-Yau Huang, Kuo-Shun Sun
Publication date: 9 March 2009
Published in: Advances in Engineering Software (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.advengsoft.2008.01.010
Recommendations
- Genetic algorithm-based multi-objective model for scheduling of linear construction projects
- A trade-off between time and cost in scheduling repetitive construction projects
- An algorithm for discrete time/cost trade-off problems in repetitive projects considering soft logic
- Application of GA optimization for solving precedent relationship problem in project scheduling
- Genetic algorithms for project management
Cites Work
Cited In (4)
- Optimization of a highway project planning using a modified genetic algorithm
- Segmentation and repetitive scheduling of linear continuous construction projects
- Genetic algorithm-based multi-objective model for scheduling of linear construction projects
- A biobjective optimization model for deadline satisfaction in line-of-balance scheduling with work interruptions consideration
This page was built for publication: A GA optimization model for workgroup-based repetitive scheduling (WoRSM)
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1005604)