A multi-criteria scheduling with due-window assignment problem
From MaRDI portal
Publication:1007672
Recommendations
- Minmax scheduling problems with a common due-window
- Due-window assignment problems with unit-time jobs
- Single-machine common due window assignment and scheduling to minimize the total cost
- Soft due window assignment and scheduling of unit-time jobs on parallel machines
- Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs
Cites work
- scientific article; zbMATH DE number 193053 (Why is no real title available?)
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Common due window size and location determination in a single machine scheduling problem
- Determination of common due window location in a single machine scheduling problem
- Multicriteria scheduling
- Simultaneous minimization of total completion time and total deviation of job completion times
Cited in
(3)
This page was built for publication: A multi-criteria scheduling with due-window assignment problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1007672)