A multi-criteria scheduling with due-window assignment problem
From MaRDI portal
Publication:1007672
DOI10.1016/J.MCM.2007.08.018zbMATH Open1156.90369OpenAlexW2067865850MaRDI QIDQ1007672FDOQ1007672
Authors: Gur Mosheiov, Assaf Sarig
Publication date: 23 March 2009
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.mcm.2007.08.018
Recommendations
- Minmax scheduling problems with a common due-window
- Due-window assignment problems with unit-time jobs
- Single-machine common due window assignment and scheduling to minimize the total cost
- Soft due window assignment and scheduling of unit-time jobs on parallel machines
- Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Multicriteria scheduling
- Common due window size and location determination in a single machine scheduling problem
- Simultaneous minimization of total completion time and total deviation of job completion times
- Determination of common due window location in a single machine scheduling problem
Cited In (2)
This page was built for publication: A multi-criteria scheduling with due-window assignment problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1007672)