Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
From MaRDI portal
Publication:1010280
DOI10.1016/J.COR.2008.11.018zbMATH Open1179.90117OpenAlexW2031161030MaRDI QIDQ1010280FDOQ1010280
Authors: Fawaz S. Al-Anzi, Ali Allahverdi
Publication date: 3 April 2009
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2008.11.018
Recommendations
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
- A hybrid tabu search heuristic for the two-stage assembly scheduling problem
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Optimal two- and three-stage production schedules with set-up time included
- A survey of scheduling problems with setup times or costs
- Scheduling flow shops using differential evolution algorithm
- A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
Cited In (10)
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- Lot streaming for a two-stage assembly system in the presence of handling costs
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times
- A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
- A data intensive heuristic approach to the two-stage streaming scheduling problem
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
This page was built for publication: Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1010280)