Planning production using mathematical programming: The case of a woodturning company
From MaRDI portal
Publication:1013389
DOI10.1016/J.COR.2008.08.005zbMATH Open1158.90380OpenAlexW2052086571MaRDI QIDQ1013389FDOQ1013389
Manuel Mateo, Rafael Pastor, Jordi Altimiras
Publication date: 17 April 2009
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2008.08.005
Case-oriented studies in operations research (90B90) Mixed integer programming (90C11) Production models (90B30)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Heuristic methods for the identical parallel machine flowtime problem with set-up times
- A survey of scheduling problems with setup times or costs
- Exact and Approximate Algorithms for Scheduling Nonidentical Processors
- Integer-programming software systems
- Integer programming to schedule a hierarchical workforce with variable demands
- The significance of reducing setup times/setup costs
- Solving Real-World Linear Programs: A Decade and More of Progress
- Planning and Scheduling in Manufacturing and Services
- Scheduling unrelated parallel machines with sequence-dependent setups
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
- A GRASP for parallel machine scheduling with time windows
- Parallel machine earliness and tardiness scheduling with proportional weights
- Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach
- Heuristics for scheduling unrelated parallel machines
- A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property
- Simultaneous lot sizing and loading of product families on parallel facilities of different classes
Cited In (4)
- Workforce planning and financing on a production/capital discrete-time model
- DEA-based production planning considering production stability
- Systems theory and evidence-based decision-making as keys for arbitrating between optimal production and efficient maintenance: a case study
- Planning production and workforce in a discrete-time financial model using scenarios modeling
This page was built for publication: Planning production using mathematical programming: The case of a woodturning company
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1013389)