Planning production using mathematical programming: The case of a woodturning company
From MaRDI portal
(Redirected from Publication:1013389)
Recommendations
- Production planning of a manufacturing industry using linear programming
- A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry
- A solution for the aggregate production planning problem in a multi-plant, multi-period and multi-product environment
- Integer linear programming for a cutting problem in the wood-processing industry: a case study
- scientific article; zbMATH DE number 970560
Cites work
- scientific article; zbMATH DE number 1640601 (Why is no real title available?)
- scientific article; zbMATH DE number 5345854 (Why is no real title available?)
- scientific article; zbMATH DE number 1167865 (Why is no real title available?)
- scientific article; zbMATH DE number 1783886 (Why is no real title available?)
- A GRASP for parallel machine scheduling with time windows
- A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property
- A survey of scheduling problems with setup times or costs
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
- Exact and Approximate Algorithms for Scheduling Nonidentical Processors
- Heuristic methods for the identical parallel machine flowtime problem with set-up times
- Heuristics for scheduling unrelated parallel machines
- Integer programming to schedule a hierarchical workforce with variable demands
- Integer-programming software systems
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Parallel machine earliness and tardiness scheduling with proportional weights
- Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach
- Planning and Scheduling in Manufacturing and Services
- Scheduling unrelated parallel machines with sequence-dependent setups
- Simultaneous lot sizing and loading of product families on parallel facilities of different classes
- Solving Real-World Linear Programs: A Decade and More of Progress
- The significance of reducing setup times/setup costs
Cited in
(4)- Workforce planning and financing on a production/capital discrete-time model
- DEA-based production planning considering production stability
- Systems theory and evidence-based decision-making as keys for arbitrating between optimal production and efficient maintenance: a case study
- Planning production and workforce in a discrete-time financial model using scenarios modeling
This page was built for publication: Planning production using mathematical programming: The case of a woodturning company
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1013389)