Scheduling of a single crane in batch annealing process
From MaRDI portal
Publication:1017463
DOI10.1016/J.COR.2008.12.014zbMATH Open1160.90486OpenAlexW2024746803MaRDI QIDQ1017463FDOQ1017463
Authors: Lixin Tang, Xie Xie, Jiyin Liu
Publication date: 19 May 2009
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2008.12.014
Recommendations
- Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading
- A HEURISTIC SCHEDULING ALGORITHM FOR STEEL MAKING PROCESS WITH CRANE HANDLING(<Special Issue>Advanced Planning and Scheduling for Supply Chain Management)
- Scheduling steel plates on a roller furnace
- Integrated problem of soaking pit heating and hot rolling scheduling in steel plants
- Genetic algorithm and its performance analysis for scheduling a single crane
Cites Work
- Optimal two- and three-stage production schedules with set-up time included
- Crane scheduling with non-crossing constraint
- A multiple-crane-constrained scheduling problem in a container terminal
- Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
- Single hoist cyclic scheduling with multiple tanks: A material handling solution
- Scheduling two-stage hybrid flow shop with availability constraints
- Title not available (Why is that?)
- Crane scheduling in container yards with inter-crane interference
- Branch and bound algorithm for the flow shop with multiple processors
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- Scheduling parallel machines with inclusive processing set restrictions
- Title not available (Why is that?)
- On some geometric methods in scheduling theory: A survey
- Heuristic algorithms for the two-stage hybrid flowshop problem
- Title not available (Why is that?)
Cited In (6)
- Genetic algorithm and its performance analysis for scheduling a single crane
- Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines
- A branch-and-cut algorithm for factory crane scheduling problem
- Intelligent scheduling of double-deck traversable cranes based on deep reinforcement learning
- Scheduling steel plates on a roller furnace
- Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading
This page was built for publication: Scheduling of a single crane in batch annealing process
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1017463)