Reliability analysis of a two-unit general parallel system with (n-2) warm standbys
From MaRDI portal
Publication:1038342
DOI10.1016/J.EJOR.2009.04.016zbMATH Open1173.90378OpenAlexW2005396113MaRDI QIDQ1038342FDOQ1038342
Authors: Effie Papageorgiou, George Kokolakis
Publication date: 17 November 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2009.04.016
Recommendations
- Reliability analysis of a two-dissimilar-unit warm standby repairable system with priority in use
- scientific article; zbMATH DE number 5371069
- A two-unit general parallel system with (\(n - 2\)) cold standbys -- analytic and simulation approach
- scientific article; zbMATH DE number 6613058
- Publication:3200867
- Reliability analysis of a single warm-standby system subject to repairable and nonrepairable failures
- Reliability analysis of the system with linear consecutive \(n - 1/n (G)\) and two cold standbys
- scientific article; zbMATH DE number 3988429
- scientific article; zbMATH DE number 530053
Cites Work
- A deteriorating cold standby repairable system with priority in use
- A geometric process maintenance model with preventive repair
- Reliability analysis of a three unit warm standby redundant system with repair
- Reliability and sensitivity analysis of a system with warm standbys and a repairable service station
- Title not available (Why is that?)
- 2-Unit Parallel System with Periods of Working and Rest
- Cost-benefit analysis of two-unit parallel system with administrative delay in repair
- On the profit comparison of two stochastic models each pertaining to a two-unit standby system with fixed preparation time and hyperexponential repair time distributions
- A two-unit parallel system supported by (n− 2) standbys with general and non-identical lifetimes
- Profit analysis of two-unit priority standby system with administrative delay in repair
- A two-unit general parallel system with (\(n - 2\)) cold standbys -- analytic and simulation approach
- Quasi-stationary distribution of a two-unit warm-standby redundant system
- Technical Note—Probabilistic Analysis of a Single-Server n-unit System with (n − 1) Warm Standbys
Cited In (21)
- Reliability-based measures and prognostic analysis of a \(K\)-out-of-\(N\) system in a random environment
- State space and binary decision diagram models for discrete standby systems with multistate components
- Reliability study of a coherent system with single general standby component
- Reliability of demand-based warm standby systems subject to fault level coverage
- On reliability analysis of a two-dependent-unit series system with a standby unit
- A two-unit general parallel system with (\(n - 2\)) cold standbys -- analytic and simulation approach
- Heterogeneous standby systems with shocks-driven preventive replacements
- Optimal choice of standby modes in 1-out-of-\(N\) system with respect to mission reliability and cost
- A complex discrete warm standby system with loss of units
- Copula-based reliability analysis for a parallel system with a cold standby
- Title not available (Why is that?)
- Reliability analysis of a single warm-standby system subject to repairable and nonrepairable failures
- Comparisons and bounds for expected lifetimes of reliability systems
- Title not available (Why is that?)
- Cold vs. hot standby mission operation cost minimization for 1-out-of-\(N\) systems
- On the reliability of Gaver's parallel system supervised by a safety unit
- Title not available (Why is that?)
- A novel optimal preventive maintenance policy for a cold standby system based on semi-Markov theory
- Reliability of a k-out-of-n warm-standby system
- Reliability analysis of a two-unit standby system by computer simulation
- A two-unit parallel system supported by (n− 2) standbys with general and non-identical lifetimes
This page was built for publication: Reliability analysis of a two-unit general parallel system with (\(n-2\)) warm standbys
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1038342)