An order expediting policy for continuous review systems with manufacturing lead-time
From MaRDI portal
Publication:1046131
DOI10.1016/j.ejor.2009.08.012zbMath1177.90011MaRDI QIDQ1046131
Publication date: 21 December 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2009.08.012
Related Items
On a multi-period supply chain system with supplementary order opportunity, Dynamic expediting of an urgent order with uncertain progress, Multiperiodic procurement problem with option contracts under inflation, Transportation mode selection in inventory models: a literature review, Typology and literature review on multiple supplier inventory control models, Inventory control policy for a periodic review system with expediting, Determining optimal parameters for expediting policies under service level constraints, A \((Q,R)\) inventory replenishment model with two delivery modes
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Simple approximations for the reorder point in periodic and continuous review (s,S) inventory systems with service level constraints
- A heuristic procedure for solving the dynamic probabilistic project expediting problem
- \((Q,r)\) inventory policies in a fuzzy uncertain supply chain environment
- Optimal ordering policies with two suppliers when lead times and demands are all stochastic
- Random lead times and expedited orders in \((Q,r)\) inventory systems
- Optimal replenishment for a periodic review inventory system with two supply modes.
- Stock Control with Two Suppliers and Normal Lead Times
- On Properties of Stochastic Inventory Systems
- Tractable (Q, R) Heuristic Models for Constrained Service Levels
- Ordering policies for inventory systems with expediting
- Reducing Inventory Costs by Order Splitting in the Sole Sourcing Environment
- Safety stock reduction by order splitting