Robust planning in optimization for production system subject to random machine breakdown and failure in rework
DOI10.1016/J.COR.2009.03.016zbMATH Open1177.90107OpenAlexW2000720426MaRDI QIDQ1046705FDOQ1046705
Authors: Singa Wang Chiu
Publication date: 22 December 2009
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2009.03.016
Recommendations
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
- Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
- Production planning of a failure-prone manufacturing system under different setup scenarios
- Service level robustness in stochastic production planning under random machine breakdowns
- Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown
Deterministic network models in operations research (90B10) Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Cites Work
- Title not available (Why is that?)
- Analysis of a production-inventory system with unreliable production facility
- Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems
- Foundations of inventory management
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Production Lot Sizing with Machine Breakdowns
- Analysis of a Production/Inventory System Subject to Random Disruptions
- Effects of random defective rate and imperfect rework process on economic production quantity model
- Analysis of a production-inventory system with machine breakdowns and shutdowns
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
- The effect of service level constraint on EPQ model with random defective rate
- Joint determination of preventive maintenance and safety stocks in an unreliable production environment
- An EMQ model with inspections and random machine failures
- Approximations to production lot sizing with machine breakdowns.
- A dynamic lot sizing model with exponential machine breakdowns
- Exact formulation of stochastic EMQ model for an unreliable production system
Cited In (15)
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management
- Minimax production planning in failure-prone manufacturing systems
- Service level robustness in stochastic production planning under random machine breakdowns
- A disruption recovery plan in a three-stage production-inventory system
- Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system
- Modeling an inventory problem with random supply, inspection and machine breakdown
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
- Title not available (Why is that?)
- A robust optimization approach to enhancing reliability in production planning under non-compliance risks
- The algorithm to locate the optimal solution for production system subject to random machine breakdown and failure in rework for supply chain management
- Optimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach
- A production model for deteriorating inventory items with production disruptions
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering
- Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance
- An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages: a type-2 fuzzy approach
This page was built for publication: Robust planning in optimization for production system subject to random machine breakdown and failure in rework
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1046705)