Some no-wait shops scheduling problems: Complexity aspect
DOI10.1016/0377-2217(86)90036-6zbMATH Open0597.90045OpenAlexW1967348328MaRDI QIDQ1079487FDOQ1079487
Authors: Chelliah Sriskandarajah, Pierre Ladet
Publication date: 1986
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(86)90036-6
Recommendations
- No-wait shop scheduling: Computational complexity and approximate algorithms
- The Three-Machine No-Wait Flow Shop is NP-Complete
- NP-hardness of compact scheduling in simplified open and flow shops.
- Two-machine flow shop scheduling problems with no-wait jobs
- A Note On The Complexity Of Openshop Scheduling Problems
computational complexityNP-completeNP-hardpolynomial time algorithm3-machine flowshopsno-wait shops schedulingoptimal finish time schedules
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- The Complexity of Flowshop and Jobshop Scheduling
- Complexity of Scheduling Shops with No Wait in Process
- Unit Execution Time Shop Problems
- On general routing problems
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Some new results in flow shop scheduling
- On the Flow-Shop Sequencing Problem with No Wait in Process†
- Solution of the Flowshop-Scheduling Problem with No Intermediate Queues
- Title not available (Why is that?)
- Performance of scheduling algorithms for no-wait flowshops with parallel machines
- The Three-Machine No-Wait Flow Shop is NP-Complete
- Flowshop scheduling with limited temporary storage
- A Scheduling Problem*
- Title not available (Why is that?)
- Title not available (Why is that?)
Cited In (34)
- The hot strip mill production scheduling problem: A tabu search approach
- The non-stop disjoint trajectories problem
- Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
- Performance of scheduling algorithms for no-wait flowshops with parallel machines
- No-wait shop scheduling: Computational complexity and approximate algorithms
- The Three-Machine No-Wait Flow Shop is NP-Complete
- An efficient algorithm for a job shop problem
- A Note On The Complexity Of Openshop Scheduling Problems
- A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage.
- Is a unit-job shop not easier than identical parallel machines?
- Title not available (Why is that?)
- On The Complexity Of The Process Shop
- Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
- The complexity of scheduling jobs in repetitive manufacturing systems
- A survey of job shop scheduling problem: the types and models
- Complete local search with limited memory algorithm for no-wait job shops to minimize makespan
- The proportionate two-machine no-wait job shop scheduling problem
- Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays
- No-idle, no-wait: when shop scheduling meets dominoes, Eulerian paths and Hamiltonian paths
- Scheduling algorithms for flexible flowshops: Worst and average case performance
- Minimizing total completion time in two-machine flow shops with exact delays
- Two-machine shop scheduling with zero and unit processing times
- A pseudo-polynomial algorithm for a two-machine no-wait job-shop scheduling problem
- Combinatorial optimization models for production scheduling in automated manufacturing systems
- Minimizing makespan in hybrid flowshops
- An introduction of dominant genes in genetic algorithm for FMS
- A two-machine no-wait flow shop problem with two competing agents
- Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity
- Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
- Two-machine flow shop scheduling problems with no-wait jobs
- Minimum deviation algorithm for two-stage no-wait flowshops with parallel machines
- On scheduling cycle shops: Classification, complexity and approximation
- On Eulerian extensions and their application to no-wait flowshop scheduling
- A survey of scheduling problems with no-wait in process
This page was built for publication: Some no-wait shops scheduling problems: Complexity aspect