EBQ for a multistage production system considering rework
From MaRDI portal
Publication:1107427
zbMath0652.90056MaRDI QIDQ1107427
R. S. V. Narasimha Rao, Subrata Chakraborty
Publication date: 1988
Published in: Opsearch (Search for Journal in Brave)
Related Items (4)
Optimizing a production system with rework and equal sized batch shipments ⋮ Optimal batch sizing in a multi-stage production system with rework consideration ⋮ A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering ⋮ An inventory model for product life cycle with maturity stage and defective items
This page was built for publication: EBQ for a multistage production system considering rework