Recommendations
- scientific article; zbMATH DE number 1082109
- scientific article; zbMATH DE number 3873052
- scientific article; zbMATH DE number 6000948
- Scheduling of a machining center
- scientific article; zbMATH DE number 1487903
- New perspectives in scheduling theory
- New challenges in scheduling theory
- New challenges in scheduling theory
- New challenges in scheduling theory
- scientific article; zbMATH DE number 1235242
Cites work
- scientific article; zbMATH DE number 3644821 (Why is no real title available?)
- scientific article; zbMATH DE number 3648431 (Why is no real title available?)
- scientific article; zbMATH DE number 3873052 (Why is no real title available?)
- scientific article; zbMATH DE number 3989090 (Why is no real title available?)
- scientific article; zbMATH DE number 3754389 (Why is no real title available?)
- scientific article; zbMATH DE number 3757695 (Why is no real title available?)
- scientific article; zbMATH DE number 3757696 (Why is no real title available?)
- scientific article; zbMATH DE number 3561065 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- A Note on Expected Makespans for Largest-First Sequences of Independent Tasks on Two Processors
- A linear time algorithm for restricted bin packing and scheduling problems
- A model of self-supervision
- Algorithm 520: An Automatic Revised Simplex Method for Constrained Resource Network Scheduling [H]
- Analysis of Several Task-Scheduling Algorithms for a Model of Multiprogramming Computer Systems
- Bounds for Multiprocessor Scheduling with Resource Constraints
- Complexity Results for Multiprocessor Scheduling under Resource Constraints
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- Multiprocessor Scheduling with Memory Allocation—A Deterministic Approach
- New directions in scheduling theory
- On general routing problems
- On queueing network models of flexible manufacturing systems
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Preemptive Scheduling, Linear Programming and Network Flows
- Prevention of system deadlocks
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Project Scheduling with Discrete and Continuous Resources
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Scheduling Multiprocessor Tasks to Minimize Schedule Length
- Scheduling subject to resource constraints: Classification and complexity
- Scheduling with deadlines and loss functions
- Stochastic scheduling problems I — General strategies
- Stochastic scheduling problems II-set strategies-
- The facility layout problem
Cited in
(23)- Some results of the relocation problems with processing times and deadlines
- scientific article; zbMATH DE number 1082109 (Why is no real title available?)
- Scheduling flexible manufacturing cells using tabu search
- An improved MOEA/D for multi-objective flexible job shop scheduling by considering efficiency and cost
- An effective algorithm for flexible assembly job‐shop scheduling with tight job constraints
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- A state-of-the-art review of parallel-machine scheduling research
- scientific article; zbMATH DE number 2086186 (Why is no real title available?)
- The duality of jobs and machines in scheduling
- Generating the best \(K\) sequences in relocation problems
- Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
- scientific article; zbMATH DE number 4095196 (Why is no real title available?)
- Solving an integrated job-shop problem with human resource constraints
- Combinatorial optimization models for production scheduling in automated manufacturing systems
- Resource-constrained job scheduling with recyclable resources
- Basic scheduling problems with raw material constraints
- Analysis of the twisting department at superior cable corporation: A case study
- Parallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints.
- scientific article; zbMATH DE number 3989090 (Why is no real title available?)
- A global MILP model for FMS scheduling
- Scheduling a two-machine robotic cell: A solvable case
- scientific article; zbMATH DE number 1786130 (Why is no real title available?)
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods
This page was built for publication: New trends in machine scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1107428)