New trends in machine scheduling
DOI10.1016/0377-2217(88)90192-0zbMATH Open0652.90058OpenAlexW2024384597WikidataQ57387916 ScholiaQ57387916MaRDI QIDQ1107428FDOQ1107428
Authors: S. H. Smith
Publication date: 1988
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(88)90192-0
Recommendations
- scientific article; zbMATH DE number 1082109
- scientific article; zbMATH DE number 3873052
- scientific article; zbMATH DE number 6000948
- Scheduling of a machining center
- scientific article; zbMATH DE number 1487903
- New perspectives in scheduling theory
- New challenges in scheduling theory
- New challenges in scheduling theory
- New challenges in scheduling theory
- scientific article; zbMATH DE number 1235242
surveyresource constraintsflexible manufacturing systemsresource constrained schedulingdeterministic machine schedulingparallel and dedicated machine systems
Deterministic scheduling theory in operations research (90B35) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02)
Cites Work
- Algorithm 520: An Automatic Revised Simplex Method for Constrained Resource Network Scheduling [H]
- Title not available (Why is that?)
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- A linear time algorithm for restricted bin packing and scheduling problems
- Title not available (Why is that?)
- Complexity Results for Multiprocessor Scheduling under Resource Constraints
- Scheduling subject to resource constraints: Classification and complexity
- Scheduling with deadlines and loss functions
- Scheduling Multiprocessor Tasks to Minimize Schedule Length
- Analysis of Several Task-Scheduling Algorithms for a Model of Multiprogramming Computer Systems
- Title not available (Why is that?)
- On general routing problems
- The facility layout problem
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Stochastic scheduling problems I — General strategies
- Title not available (Why is that?)
- Bounds for Multiprocessor Scheduling with Resource Constraints
- A Note on Expected Makespans for Largest-First Sequences of Independent Tasks on Two Processors
- Title not available (Why is that?)
- Multiprocessor Scheduling with Memory Allocation—A Deterministic Approach
- Prevention of system deadlocks
- Project Scheduling with Discrete and Continuous Resources
- On queueing network models of flexible manufacturing systems
- Stochastic scheduling problems II-set strategies-
- New directions in scheduling theory
- Title not available (Why is that?)
- Preemptive Scheduling, Linear Programming and Network Flows
- Title not available (Why is that?)
- Title not available (Why is that?)
- A model of self-supervision
Cited In (23)
- Some results of the relocation problems with processing times and deadlines
- Title not available (Why is that?)
- Scheduling flexible manufacturing cells using tabu search
- An improved MOEA/D for multi-objective flexible job shop scheduling by considering efficiency and cost
- An effective algorithm for flexible assembly job‐shop scheduling with tight job constraints
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- A state-of-the-art review of parallel-machine scheduling research
- Title not available (Why is that?)
- The duality of jobs and machines in scheduling
- Title not available (Why is that?)
- Generating the best \(K\) sequences in relocation problems
- Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
- Solving an integrated job-shop problem with human resource constraints
- Combinatorial optimization models for production scheduling in automated manufacturing systems
- Resource-constrained job scheduling with recyclable resources
- Basic scheduling problems with raw material constraints
- Analysis of the twisting department at superior cable corporation: A case study
- Title not available (Why is that?)
- Parallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints.
- A global MILP model for FMS scheduling
- Scheduling a two-machine robotic cell: A solvable case
- Title not available (Why is that?)
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods
Uses Software
This page was built for publication: New trends in machine scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1107428)