An alternative proof of optimality for the common due-date assignment problem
From MaRDI portal
DOI10.1016/0377-2217(88)90334-7zbMATH Open0652.90059OpenAlexW2106427660MaRDI QIDQ1107429FDOQ1107429
Authors: T. C. Edwin Cheng
Publication date: 1988
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(88)90334-7
Recommendations
- A Note on the Common Due-Date Assignment Problem
- Optimal common due-date with limited completion time
- On Optimal Common Due-Date Determination
- A note on ``Minimizing the maximum deviation of job completion time about a common due-date
- On a single-machine optimal constant due-date assignment and sequencing problem
alternative proofcommon due-datesconstrained convex programmingKuhn- Tucker's optimality conditionsn-job, one-machine scheduling
Cites Work
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Minimizing mean absolute deviation of completion times about a common due date
- Minimizing the average deviation of job completion times about a common due date
- Minimizing the sum of absolute lateness in single-machine and multimachine scheduling
Cited In (12)
- A note on ``Minimizing the maximum deviation of job completion time about a common due-date
- Optimal common due-date with limited completion time
- A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems
- A heuristic for single machine common due date assignment problem with different earliness/tardiness weights
- A Generalized Model of Optimal Due-Date Assignment by Linear Programming
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Survey of scheduling research involving due date determination decisions
- Single machine scheduling with common due data assignment in a group technology environment
- Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms
- On the general solution for a class of early/tardy problems
- Scheduling under a common due-date on parallel unrelated machines
- A Note on the Common Due-Date Assignment Problem
This page was built for publication: An alternative proof of optimality for the common due-date assignment problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1107429)