Lot sizing with quality improvement and setup time reduction
From MaRDI portal
Publication:1124814
Recommendations
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Productivity enhancement through lot size optimization
- Dynamic lot-sizing with setup cost reduction
- Quality improvement and setup reduction in the joint economic lot size model
- Production lot sizing with quality screening and rework
- Lot sizes and setup frequency with learning in setups and process quality
- Lot-sizing scheduling with batch setup times
- Lot-sizing with production and delivery time windows
- Hierarchically integrated lot size optimization
Cites work
- An economic production quantity model with flexibility and reliability considerations
- EPQ with Process Capability and Quality Assurance Considerations
- Investing in new parameter values in the discounted EOQ model
- Investing in Reduced Setups in the EOQ Model
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- OR contributions to flexibility improvement in production/inventory systems
- Reliability, pricing and quality control
Cited in
(17)- Optimal setup time reduction for a single product with dynamic demands
- Lot sizes and setup frequency with learning in setups and process quality
- Dynamic lot-sizing with setup cost reduction
- Quality improvement and setup reduction in the joint economic lot size model
- Product balancing under conditions of quality inflation, cost pressures and growth strategies
- Process quality adjusted lot sizing and marketing interface in JIT environment
- Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction
- The dynamics of price, quality and productivity improvement decisions
- Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction
- Lot-sizing with start-up times
- Just-in-time planning and lot-sizing
- Economic order and production quantity models without constraint on the percentage of defective items
- The use of minor setups within production cycles to improve product quality and yield
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Evaluating capacity change and setup time reduction in a capacity-constrained, joint lot sizing situation
- A workload balancing model for determining set-up time and batch size reductions in GT flow line workcells
- EOQ model with defective products, batch shipment and partial backorders
This page was built for publication: Lot sizing with quality improvement and setup time reduction
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1124814)