The impact of defects on a process with rework
From MaRDI portal
(Redirected from Publication:1129933)
Recommendations
- Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
- Production lot sizing with quality screening and rework
- The value of setup cost reduction and process improvement for the economic production quantity model with defects
- Interactive Process Quality Improvement
- Batching work and rework processes with limited deterioration of reworkables
Cites work
- scientific article; zbMATH DE number 3532286 (Why is no real title available?)
- scientific article; zbMATH DE number 3249395 (Why is no real title available?)
- AnM/M/1 queue with delayed feedback
- Performance evaluation of a flexible manufacturing cell with random multiproduct feedback flow
- Queues with delayed feedback
- The impact of defects on a process with rework
Cited in
(8)- Optimal batch sizing in a multi-stage production system with rework consideration
- Learning curves for processes generating defects requiring reworks
- A rework-based dispatching algorithm for module process in TFT-LCD manufacture
- A bulk queueing system with rework in manufacturing industry with starting failure and single vacation
- The impact of defects on a process with rework
- Multi-item imperfect production inventory model in bi-fuzzy environments
- Learning curves for imperfect production processes with reworks and process restoration interruptions
- Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
This page was built for publication: The impact of defects on a process with rework
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1129933)