The impact of defects on a process with rework
From MaRDI portal
Publication:1129933
DOI10.1016/0377-2217(94)00173-AzbMath0928.90014OpenAlexW2012440114WikidataQ120821820 ScholiaQ120821820MaRDI QIDQ1129933
Saligrama R. Agnihothri, Ron S. Kenett
Publication date: 16 August 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00173-a
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Related Items
A rework-based dispatching algorithm for module process in TFT-LCD manufacture ⋮ Learning curves for processes generating defects requiring reworks ⋮ Optimal batch sizing in a multi-stage production system with rework consideration ⋮ The impact of defects on a process with rework ⋮ Multi-item imperfect production inventory model in bi-fuzzy environments ⋮ Learning curves for imperfect production processes with reworks and process restoration interruptions ⋮ A bulk queueing system with rework in manufacturing industry with starting failure and single vacation ⋮ Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
Cites Work